80_FR_15258 80 FR 15203 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

80 FR 15203 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 80, Issue 55 (March 23, 2015)

Page Range15203-15203
FR Document2015-06559

On March 2, 2015, NTE Ohio, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self- certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

Federal Register, Volume 80 Issue 55 (Monday, March 23, 2015)
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Page 15203]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-06559]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--232]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Filing.

-----------------------------------------------------------------------

SUMMARY: On March 2, 2015, NTE Ohio, LLC, as owner and operator of a 
new base load electric powerplant, submitted a coal capability self-
certification to the Department of Energy (DOE) pursuant to Sec.  
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as 
amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 
501.61(c).

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA section 201(a) as of the date it is filed with the Secretary. 42 
U.S.C. 8311.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60, 61:
    Owner: NTE Ohio, LLC.
    Capacity: 525 megawatts (MW).
    Plant Location: Cincinnati Dayton Road, Middletown, Ohio.
    In-Service Date: As early as January 2018.

    Issued in Washington, DC, on March 17, 2015.
Brian Mills,
 Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. 2015-06559 Filed 3-20-15; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices                                                   15203

                                                  submit brief, text-only comments on a                   the proceeding by filing a request to                 Department of Energy (DOE) pursuant to
                                                  project;                                                intervene. Instructions for becoming an               § 201(d) of the Powerplant and
                                                     (2) You can file your comments                       intervenor are in the User’s Guide under              Industrial Fuel Use Act of 1978 (FUA),
                                                  electronically using the eFiling feature                the ‘‘e-filing’’ link on the Commission’s             as amended, and DOE regulations in 10
                                                  located on the Commission’s Web site                    Web site. Please note that the                        CFR 501.60, 61. FUA and regulations
                                                  (www.ferc.gov) under the link to                        Commission will not accept requests for               thereunder require DOE to publish a
                                                  Documents and Filings. With eFiling,                    intervenor status at this time. You must              notice of filing of self-certification in the
                                                  you can provide comments in a variety                   wait until the Commission receives a                  Federal Register. 42 U.S.C. 8311(d) and
                                                  of formats by attaching them as a file                  formal application for the project.                   10 CFR 501.61(c).
                                                  with your submission. New eFiling
                                                  users must first create an account by                   Additional Information                                ADDRESSES:    Copies of coal capability
                                                  clicking on ‘‘eRegister.’’ You must select                 Additional information about the                   self-certification filings are available for
                                                  the type of filing you are making. If you               project is available from the                         public inspection, upon request, in the
                                                  are filing a comment on a particular                    Commission’s Office of External Affairs,              Office of Electricity Delivery and Energy
                                                  project, please select ‘‘Comment on a                   at (866) 208–FERC, or on the FERC Web                 Reliability, Mail Code OE–20, Room
                                                  Filing’’; or                                            site (www.ferc.gov) using the eLibrary                8G–024, Forrestal Building, 1000
                                                     (3) You can file a paper copy of your                link. Click on the eLibrary link, click on            Independence Avenue SW.,
                                                  comments by mailing them to the                         ‘‘General Search’’ and enter the docket               Washington, DC 20585.
                                                  following address:                                      number, excluding the last three digits
                                                  Kimberly D. Bose, Secretary, Federal                    in the Docket Number field (i.e., PF15–               FOR FURTHER INFORMATION CONTACT:
                                                  Energy Regulatory Commission, 888                       9). Be sure you have selected an                      Christopher Lawrence at (202) 586–
                                                  First Street NE., Room 1A, Washington,                  appropriate date range. For assistance,               5260.
                                                  DC 20426.                                               please contact FERC Online Support at
                                                                                                                                                                SUPPLEMENTARY INFORMATION:       Title II of
                                                  Environmental Mailing List                              FercOnlineSupport@ferc.gov or toll free
                                                                                                          at (866) 208–3676, or for TTY, contact                FUA, as amended (42 U.S.C. 8301 et
                                                     The environmental mailing list                       (202) 502–8659. The eLibrary link also                seq.), provides that no new base load
                                                  includes federal, state, and local                      provides access to the texts of formal                electric powerplant may be constructed
                                                  government representatives and                          documents issued by the Commission,                   or operated without the capability to use
                                                  agencies; elected officials;                            such as orders, notices, and                          coal or another alternate fuel as a
                                                  environmental and public interest                       rulemakings.                                          primary energy source. Pursuant to FUA
                                                  groups; Native American Tribes; other                      In addition, the Commission offers a               in order to meet the requirement of coal
                                                  interested parties; and local libraries                 free service called eSubscription which               capability, the owner or operator of such
                                                  and newspapers. This list also includes                 allows you to keep track of all formal                a facility proposing to use natural gas or
                                                  all affected landowners (as defined in                  issuances and submittals in specific                  petroleum as its primary energy source
                                                  the Commission’s regulations) who are                   dockets. This can reduce the amount of                shall certify to the Secretary of Energy
                                                  potential right-of-way grantors, whose                  time you spend researching proceedings                (Secretary) prior to construction, or
                                                  property may be used temporarily for                    by automatically providing you with                   prior to operation as a base load electric
                                                  project purposes, or who own homes                      notification of these filings, document               powerplant, that such powerplant has
                                                  within certain distances of aboveground                 summaries, and direct links to the
                                                  facilities, and anyone who submits                                                                            the capability to use coal or another
                                                                                                          documents. Go to www.ferc.gov/docs-                   alternate fuel. Such certification
                                                  comments on the project. We will                        filing/esubscription.asp.
                                                  update the environmental mailing list as                                                                      establishes compliance with FUA
                                                                                                             Finally, public meetings or site visits            section 201(a) as of the date it is filed
                                                  the analysis proceeds to ensure that we                 will be posted on the Commission’s
                                                  send the information related to this                                                                          with the Secretary. 42 U.S.C. 8311.
                                                                                                          calendar located at www.ferc.gov/
                                                  environmental review to all individuals,                EventCalendar/EventsList.aspx along                      The following owner of a proposed
                                                  organizations, and government entities                  with other related information.                       new base load electric powerplant has
                                                  interested in and/or potentially affected                                                                     filed a self-certification of coal-
                                                  by the planned project.                                   Dated: March 16, 2015.
                                                                                                                                                                capability with DOE pursuant to FUA
                                                     If we publish and distribute the EA,                 Kimberly D. Bose,                                     section 201(d) and in accordance with
                                                  copies will be sent to the environmental                Secretary.                                            DOE regulations in 10 CFR 501.60, 61:
                                                  mailing list for public review and                      [FR Doc. 2015–06530 Filed 3–20–15; 8:45 am]
                                                  comment. If you would prefer to receive                                                                          Owner: NTE Ohio, LLC.
                                                                                                          BILLING CODE 6717–01–P
                                                  a paper copy of the document instead of                                                                          Capacity: 525 megawatts (MW).
                                                  the CD version or would like to remove                                                                           Plant Location: Cincinnati Dayton
                                                  your name from the mailing list, please                 DEPARTMENT OF ENERGY                                  Road, Middletown, Ohio.
                                                  return the attached Information Request
                                                                                                          [Certification Notice—232]                               In-Service Date: As early as January
                                                  (appendix 2).
                                                                                                                                                                2018.
                                                  Becoming an Intervenor                                  Notice of Filing of Self-Certification of
                                                                                                          Coal Capability Under the Powerplant                    Issued in Washington, DC, on March 17,
                                                    Once Sunbury files its application                                                                          2015.
                                                                                                          and Industrial Fuel Use Act
                                                  with the Commission, you may want to                                                                          Brian Mills,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  become an ‘‘intervenor’’ which is an                    AGENCY: Office of Electricity Delivery
                                                  official party to the Commission’s                                                                            Director, Permitting and Siting, Office of
                                                                                                          and Energy Reliability, DOE.
                                                                                                                                                                Electricity Delivery and Energy Reliability.
                                                  proceeding. Intervenors play a more                     ACTION: Notice of Filing.                             [FR Doc. 2015–06559 Filed 3–20–15; 8:45 am]
                                                  formal role in the process and are able
                                                  to file briefs, appear at hearings, and be              SUMMARY:  On March 2, 2015, NTE Ohio,                 BILLING CODE 6450–01–P
                                                  heard by the courts if they choose to                   LLC, as owner and operator of a new
                                                  appeal the Commission’s final ruling.                   base load electric powerplant, submitted
                                                  An intervenor formally participates in                  a coal capability self-certification to the


                                             VerDate Sep<11>2014   16:51 Mar 20, 2015   Jkt 235001   PO 00000   Frm 00018   Fmt 4703   Sfmt 9990   E:\FR\FM\23MRN1.SGM   23MRN1



Document Created: 2018-02-21 09:47:43
Document Modified: 2018-02-21 09:47:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Filing.
DatesAs early as January 2018.
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation80 FR 15203 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR