80_FR_57989 80 FR 57803 - Alabama Power Company; Notice of Authorization for Continued Project Operation

80 FR 57803 - Alabama Power Company; Notice of Authorization for Continued Project Operation

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 186 (September 25, 2015)

Page Range57803-57803
FR Document2015-24382

Federal Register, Volume 80 Issue 186 (Friday, September 25, 2015)
[Federal Register Volume 80, Number 186 (Friday, September 25, 2015)]
[Notices]
[Page 57803]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-24382]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2203-000]


Alabama Power Company; Notice of Authorization for Continued 
Project Operation

    On August 16, 2013, Alabama Power Company, licensee for the Holt 
Hydroelectric Project, filed an Application for a New License pursuant 
to the Federal Power Act (FPA) and the Commission's regulations 
thereunder. The Holt Hydroelectric Project is located on the Black 
Warrior River, in Tuscaloosa County, Alabama.
    The license for Project No. 2203 was issued for a period ending 
August 31, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR.16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2203 is issued to 
the licensee for a period effective September 1, 2015 through August 
31, 2016 or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first.
    If issuance of a new license (or other disposition) does not take 
place on or before August 31, 2016, notice is hereby given that, 
pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) 
of the FPA is renewed automatically without further order or notice by 
the Commission, unless the Commission orders otherwise. If the project 
is not subject to section 15 of the FPA, notice is hereby given that 
the licensee, Alabama Power Company, is authorized to continue 
operation of the Holt Hydroelectric Project, until such time as the 
Commission acts on its application for a subsequent license.

    Dated: September 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24382 Filed 9-24-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 80, No. 186 / Friday, September 25, 2015 / Notices                                           57803

                                                  Regulations (18 CFR 385.211 and                         to continue project operations until the              463–2418, email address: itsme_ss@
                                                  385.214) on or before 5:00 p.m. Eastern                 Commission issues someone else a                      suddenlink.net.
                                                  time on the specified comment date.                     license for the project or otherwise                     i. FERC Contact: Any questions on
                                                  Protests may be considered, but                         orders disposition of the project.                    this notice should be addressed to
                                                  intervention is necessary to become a                      If the project is subject to section 15            Jennifer Polardino, (202) 502–6437, or
                                                  party to the proceeding.                                of the FPA, notice is hereby given that               email address: Jennifer.Polardino@
                                                     eFiling is encouraged. More detailed                 an annual license for Project No. 2203                ferc.gov.
                                                  information relating to filing                          is issued to the licensee for a period                   j. Deadline for filing comments,
                                                  requirements, interventions, protests,                  effective September 1, 2015 through                   protests, and motions to intervene is: 30
                                                  service, and qualifying facilities filings              August 31, 2016 or until the issuance of              days from the issuance date of this
                                                  can be found at: http://www.ferc.gov/                   a new license for the project or other                notice by the Commission.
                                                  docs-filing/efiling/filing-req.pdf. For                 disposition under the FPA, whichever                     The Commission strongly encourages
                                                  other information, call (866) 208–3676                  comes first.                                          electronic filing. Please file comments,
                                                  (toll free). For TTY, call (202) 502–8659.                 If issuance of a new license (or other             protests, and motions to intervene using
                                                                                                          disposition) does not take place on or                the Commission’s eFiling system at
                                                    Dated: September 21, 2015.                                                                                  http://www.ferc.gov/docs-filing/
                                                  Nathaniel J. Davis, Sr.,
                                                                                                          before August 31, 2016, notice is hereby
                                                                                                          given that, pursuant to 18 CFR 16.18(c),              efiling.asp. Commenters can submit
                                                  Deputy Secretary.                                                                                             brief comments up to 6,000 characters,
                                                                                                          an annual license under section 15(a)(1)
                                                  [FR Doc. 2015–24370 Filed 9–24–15; 8:45 am]
                                                                                                          of the FPA is renewed automatically                   without prior registration, using the
                                                  BILLING CODE 6717–01–P                                  without further order or notice by the                eComment system at http://
                                                                                                          Commission, unless the Commission                     www.ferc.gov/docs-filing/
                                                                                                          orders otherwise. If the project is not               ecomment.asp. You must include your
                                                  DEPARTMENT OF ENERGY                                                                                          name and contact information at the end
                                                                                                          subject to section 15 of the FPA, notice
                                                                                                          is hereby given that the licensee,                    of your comments. For assistance,
                                                  Federal Energy Regulatory                                                                                     please contact FERC Online Support at
                                                  Commission                                              Alabama Power Company, is authorized
                                                                                                                                                                FERCOnlineSupport@ferc.gov, (866)
                                                                                                          to continue operation of the Holt
                                                  [Project No. 2203–000]                                                                                        208–3676 (toll free), or (202) 502–8659
                                                                                                          Hydroelectric Project, until such time as
                                                                                                                                                                (TTY). In lieu of electronic filing, please
                                                                                                          the Commission acts on its application
                                                  Alabama Power Company; Notice of                                                                              send a paper copy to: Secretary, Federal
                                                                                                          for a subsequent license.
                                                  Authorization for Continued Project                                                                           Energy Regulatory Commission, 888
                                                  Operation                                                 Dated: September 3, 2015.                           First Street, NE., Washington, DC 20426.
                                                                                                          Nathaniel J. Davis, Sr.,                              The first page of any filing should
                                                     On August 16, 2013, Alabama Power                    Deputy Secretary.                                     include docket number DI15–04–000.
                                                  Company, licensee for the Holt                          [FR Doc. 2015–24382 Filed 9–24–15; 8:45 am]              k. Description of Project: The
                                                  Hydroelectric Project, filed an                                                                               proposed run-of-river Patton Colorado
                                                                                                          BILLING CODE 6717–01–P
                                                  Application for a New License pursuant                                                                        Hydropower Project would consist of:
                                                  to the Federal Power Act (FPA) and the                                                                        (1) Diverting water from Columbine
                                                  Commission’s regulations thereunder.                    DEPARTMENT OF ENERGY                                  Creek through either a 10-inch-diameter
                                                  The Holt Hydroelectric Project is                                                                             pipe or two 6-inch diameter pipes, by
                                                  located on the Black Warrior River, in                  Federal Energy Regulatory                             220-foot-long, leading to a gravitation
                                                  Tuscaloosa County, Alabama.                             Commission                                            water vortex type generating unit; (2) a
                                                     The license for Project No. 2203 was                                                                       generating unit rated between 2 to 10
                                                  issued for a period ending August 31,                   [Docket No. DI15–4–000]
                                                                                                                                                                kilowatt (kW) with a rated head of 8
                                                  2015. Section 15(a)(1) of the FPA, 16                   Steve Patton; Notice of Declaration of                feet; and (3) appurtenant facilities.
                                                  U.S.C. 808(a)(1), requires the                          Intention and Soliciting Comments,                       When a Declaration of Intention is
                                                  Commission, at the expiration of a                      Protests, and Motions To Intervene                    filed with the Federal Energy Regulatory
                                                  license term, to issue from year-to-year                                                                      Commission, the Federal Power Act
                                                  an annual license to the then licensee                     Take notice that the following                     requires the Commission to investigate
                                                  under the terms and conditions of the                   application has been filed with the                   and determine if the project would
                                                  prior license until a new license is                    Commission and is available for public                affect the interests of interstate or
                                                  issued, or the project is otherwise                     inspection:                                           foreign commerce. The Commission also
                                                  disposed of as provided in section 15 or                   a. Application Type: Declaration of                determines whether or not the project:
                                                  any other applicable section of the FPA.                Intention.                                            (1) Would be located on a navigable
                                                  If the project’s prior license waived the                  b. Docket No: DI15–4–000.                          waterway; (2) would occupy public
                                                  applicability of section 15 of the FPA,                    c. Date Filed: May 11, 2015.                       lands or reservations of the United
                                                  then, based on section 9(b) of the                         d. Applicant: Steve Patton.                        States; (3) would utilize surplus water
                                                  Administrative Procedure Act, 5 U.S.C.                     e. Name of Project: Patton Colorado                or water power from a government dam;
                                                  558(c), and as set forth at 18 CFR                      Hydropower Project.                                   or (4) would be located on a non-
                                                  16.21(a), if the licensee of such project                  f. Location: The proposed Patton                   navigable stream over which Congress
                                                  has filed an application for a subsequent               Colorado Hydropower Project will be                   has Commerce Clause jurisdiction and
                                                  license, the licensee may continue to                   located on Columbine Creek (feeder to                 would be constructed or enlarged after
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  operate the project in accordance with                  South Fork of Rio Grande) in the town                 1935.
                                                  the terms and conditions of the license                 of Southfork, Mineral County, Colorado.                  l. Locations of the Application: This
                                                  after the minor or minor part license                      g. Filed Pursuant to: Section 23(b)(1)             filing may be viewed on the
                                                  expires, until the Commission acts on                   of the Federal Power Act, 16 U.S.C                    Commission’s Web site at http://
                                                  its application. If the licensee of such a              817(b) (2012).                                        www.ferc.gov/docs-filing/elibrary.asp.
                                                  project has not filed an application for                   h. Applicant Contact: Steve Patton,                Enter the docket number excluding the
                                                  a subsequent license, then it may be                    2418 Hawthorne, Amarillo, TX 79109;                   last three digits in the docket number
                                                  required, pursuant to 18 CFR.16.21(b),                  telephone: (806) 355–2418, fax: (806)                 field to access the document. You may


                                             VerDate Sep<11>2014   19:58 Sep 24, 2015   Jkt 235001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\25SEN1.SGM   25SEN1



Document Created: 2018-02-26 10:19:41
Document Modified: 2018-02-26 10:19:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 57803 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR