81_FR_37302 81 FR 37191 - Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 37191 - Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 111 (June 9, 2016)

Page Range37191-37191
FR Document2016-13648

Federal Register, Volume 81 Issue 111 (Thursday, June 9, 2016)
[Federal Register Volume 81, Number 111 (Thursday, June 9, 2016)]
[Notices]
[Page 37191]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-13648]



[[Page 37191]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14782-000]


Energy Resources USA Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On May 4, 2016, Energy Resources USA Inc. filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the R.D. Bailey Dam 
Hydroelectric Project (R.D. Bailey Project or project) to be located at 
the existing U.S. Army Corps of Engineers' R.D. Bailey Dam on the 
Guyandotte River in Mingo and Wyoming Counties, West Virginia. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) A new 90-
foot-long by 45-foot-wide reinforced concrete powerhouse to be located 
downstream on the tailrace side of R.D. Bailey Dam; (2) a new 12-foot 
by 9-foot by 250-foot-long concrete conduit connecting the existing 
outlet tunnel with the powerhouse; (3) two 5-megawatt (MW) vertical 
Kaplan turbine-generator units with a total generating capacity of 10 
MW; (4) a new 120-foot-long by 80-foot-wide tailrace; (5) a new 60-
foot-long by 50-foot-wide substation with a 10-mega-volt-ampere 4.16/
69-kilovolt (kV) three-phase step-up transformer; (6) a new 0.6-mile-
long, 69-kV transmission line; and (7) appurtenant facilities. The R.D. 
Bailey Project would have an estimated annual generation of 38.5 
gigawatt-hours.
    Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 
350 Lincoln Road, 2nd Floor, Miami, FL 33139; telephone (954) 248-8425.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14782-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14782) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 2, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-13648 Filed 6-8-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 111 / Thursday, June 9, 2016 / Notices                                            37191

                                                DEPARTMENT OF ENERGY                                       The Commission strongly encourages                    The projects would all be located at
                                                                                                        electronic filing. Please file comments,               existing locks and dams owned by the
                                                Federal Energy Regulatory                               motions to intervene, notices of intent,               U.S. Army Corps of Engineers. The
                                                Commission                                              and competing applications using the                   Emsworth Locks and Dam Hydroelectric
                                                                                                        Commission’s eFiling system at http://                 Project would be located on the Ohio
                                                [Project No. 14782–000]                                 www.ferc.gov/docs-filing/efiling.asp.                  River near Emsworth, Pennsylvania, in
                                                                                                        Commenters can submit brief comments                   Allegheny County at river mile (RM)
                                                Energy Resources USA Inc.; Notice of                    up to 6,000 characters, without prior
                                                Preliminary Permit Application                                                                                 6.2. The Emsworth Back Channel
                                                                                                        registration, using the eComment system                Hydroelectric Project would be located
                                                Accepted for Filing and Soliciting                      at http://www.ferc.gov/docs-filing/
                                                Comments, Motions To Intervene, and                                                                            on the Ohio River near Coraopolis,
                                                                                                        ecomment.asp. You must include your                    Pennsylvania, in Allegheny County at
                                                Competing Applications                                  name and contact information at the end
                                                                                                                                                               RM 6.8. The Montgomery Locks and
                                                   On May 4, 2016, Energy Resources                     of your comments. For assistance,
                                                                                                                                                               Dam Hydroelectric Project would be
                                                USA Inc. filed an application for a                     please contact FERC Online Support at
                                                                                                                                                               located on the Ohio River downstream
                                                preliminary permit, pursuant to section                 FERCOnlineSupport@ferc.gov, (866)
                                                                                                        208–3676 (toll free), or (202) 502–8659                of Monaca, Pennsylvania, in Beaver
                                                4(f) of the Federal Power Act (FPA),                                                                           County at RM 31.7. The projects would
                                                proposing to study the feasibility of the               (TTY). In lieu of electronic filing, please
                                                                                                        send a paper copy to: Secretary, Federal               collectively occupy 17.1 acres of federal
                                                R.D. Bailey Dam Hydroelectric Project                                                                          land.
                                                (R.D. Bailey Project or project) to be                  Energy Regulatory Commission, 888
                                                located at the existing U.S. Army Corps                 First Street NE., Washington, DC 20426.                   Staff has prepared a multi-project
                                                of Engineers’ R.D. Bailey Dam on the                    The first page of any filing should                    environmental assessment (EA) that
                                                Guyandotte River in Mingo and                           include docket number P–14782–000.                     analyzes the potential environmental
                                                Wyoming Counties, West Virginia. The                       More information about this project,                effects of the three projects and
                                                sole purpose of a preliminary permit, if                including a copy of the application, can               concludes that constructing and
                                                issued, is to grant the permit holder                   be viewed or printed on the ‘‘eLibrary’’               operating the projects, with appropriate
                                                priority to file a license application                  link of the Commission’s Web site at                   environmental protection measures,
                                                during the permit term. A preliminary                   http://www.ferc.gov/docs-filing/                       would not constitute a major federal
                                                permit does not authorize the permit                    elibrary.asp. Enter the docket number                  action that would significantly affect the
                                                holder to perform any land-disturbing                   (P–14782) in the docket number field to                quality of the human environment.
                                                activities or otherwise enter upon lands                access the document. For assistance,
                                                                                                        contact FERC Online Support.                              A copy of the EA is available for
                                                or waters owned by others without the
                                                owners’ express permission.                                                                                    review at the Commission in the Public
                                                                                                          Dated: June 2, 2016.                                 Reference Room or may be viewed on
                                                   The proposed project would consist of                Kimberly D. Bose,
                                                the following: (1) A new 90-foot-long by                                                                       the Commission’s Web site at
                                                                                                        Secretary.                                             www.ferc.gov using the ‘‘eLibrary’’ link.
                                                45-foot-wide reinforced concrete
                                                powerhouse to be located downstream
                                                                                                        [FR Doc. 2016–13648 Filed 6–8–16; 8:45 am]             Enter the docket number, excluding the
                                                on the tailrace side of R.D. Bailey Dam;                BILLING CODE 6717–01–P                                 last three digits, in the docket number
                                                (2) a new 12-foot by 9-foot by 250-foot-                                                                       field to access the document. For
                                                long concrete conduit connecting the                                                                           assistance, contact FERC Online
                                                                                                        DEPARTMENT OF ENERGY                                   Support at FERCOnlineSupport@
                                                existing outlet tunnel with the
                                                powerhouse; (3) two 5-megawatt (MW)                     Federal Energy Regulatory                              ferc.gov or toll-free at 1–866–208–3676,
                                                vertical Kaplan turbine-generator units                 Commission                                             or for TTY, (202) 502–8659.
                                                with a total generating capacity of 10                                                                            You may also register online at http://
                                                MW; (4) a new 120-foot-long by 80-foot-                                                                        www.ferc.gov/docs-filing/esubscription.
                                                wide tailrace; (5) a new 60-foot-long by                [Project No. 13757–002; Project No. 13761–
                                                                                                        002; Project No. 13768–002]                            asp to be notified via email of new
                                                50-foot-wide substation with a 10-mega-                                                                        filings and issuances related to these or
                                                volt-ampere 4.16/69-kilovolt (kV) three-                FFP Missouri 5, LLC; FFP Missouri 6,                   other pending projects. For assistance,
                                                phase step-up transformer; (6) a new                    LLC; Solia 6 Hydroelectric, LLC; Notice                contact FERC Online Support.
                                                0.6-mile-long, 69-kV transmission line;                 of Availability of Environmental
                                                and (7) appurtenant facilities. The R.D.                                                                          Any comments should be filed within
                                                                                                        Assessment
                                                Bailey Project would have an estimated                                                                         30 days from the date of this notice. The
                                                annual generation of 38.5 gigawatt-                       In accordance with the National                      Commission strongly encourages
                                                hours.                                                  Environmental Policy Act of 1969 and                   electronic filing. Please file comments
                                                   Applicant Contact: Mr. Ander                         the Federal Energy Regulatory                          using the Commission’s eFiling system
                                                Gonzalez, Energy Resources USA Inc.,                    Commission’s (Commission or FERC)                      at http://www.ferc.gov/docs-filing/
                                                350 Lincoln Road, 2nd Floor, Miami, FL                  regulations, 18 Code of Federal                        efiling.asp. For assistance, please
                                                33139; telephone (954) 248–8425.                        Regulations Part 380, Office of Energy                 contact FERC Online Support at FERC
                                                   FERC Contact: Monir Chowdhury;                       Projects staff has reviewed applications               OnlineSupport@ferc.gov or toll-free at
                                                phone: (202) 502–6736.                                  for original licenses for the Emsworth                 1–866–208–3676, or for TTY, 202–502–
                                                   Deadline for filing comments, motions                Locks and Dam Hydroelectric Project                    8659. In lieu of electronic filing, please
sradovich on DSK3TPTVN1PROD with NOTICES




                                                to intervene, competing applications                    (FERC No. 13757–002), Emsworth Back                    send a paper copy to: Secretary, Federal
                                                (without notices of intent), or notices of              Channel Hydroelectric Project (FERC                    Energy Regulatory Commission, 888
                                                intent to file competing applications: 60               No. 13761–002), and Montgomery Locks                   First Street NE., Washington, DC 20426.
                                                days from the issuance of this notice.                  and Dam Hydroelectric Project (FERC                    The first page of any filing should
                                                Competing applications and notices of                   No. 13768–002) on the Ohio River.                      include: ‘‘Emsworth Locks and Dam
                                                intent must meet the requirements of 18                 These projects are referred to                         Hydroelectric Project No. 13757–002,
                                                CFR 4.36.                                               collectively as the Ohio River Projects.


                                           VerDate Sep<11>2014   19:46 Jun 08, 2016   Jkt 238001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\09JNN1.SGM   09JNN1



Document Created: 2018-02-08 07:34:03
Document Modified: 2018-02-08 07:34:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 37191 

2025 Federal Register | Disclaimer | Privacy Policy