81_FR_473 81 FR 470 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

81 FR 470 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 81, Issue 3 (January 6, 2016)

Page Range470-471
FR Document2015-33317

On December 17, 2015, CPV Towantic, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

Federal Register, Volume 81 Issue 3 (Wednesday, January 6, 2016)
[Federal Register Volume 81, Number 3 (Wednesday, January 6, 2016)]
[Notices]
[Pages 470-471]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-33317]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--237]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On December 17, 2015, CPV Towantic, LLC, as owner and operator 
of a new base load electric powerplant, submitted a coal capability 
self-certification to the Department of Energy (DOE) pursuant to Sec.  
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as 
amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 
501.61(c).

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA

[[Page 471]]

section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 
8311.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60, 61:

OWNER: CPV Towantic, LLC
CAPACITY: 785 megawatts (MW)
PLANT LOCATION: CPV Towantic Energy Center, 16 Woodruff Hill Road, 
Oxford, CT 06478
IN-SERVICE DATE: May 1, 2018

    Issued in Washington, DC, on December 30, 2015.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2015-33317 Filed 1-5-16; 8:45 am]
BILLING CODE 6450-01-P



                                                  470                          Federal Register / Vol. 81, No. 3 / Wednesday, January 6, 2016 / Notices

                                                  meeting or at any time regarding the                    Tentative Agenda                                         Minutes: Minutes will be available by
                                                  Board’s mission. Individuals submitting                                                                        writing or calling James Giusti at the
                                                                                                          Monday, January 25, 2016
                                                  a written statement must submit their                                                                          address or phone number listed above.
                                                  statement to the Designated Federal                     1:00 p.m. Opening and Agenda Review                    Minutes will also be available at the
                                                  Officer at the address listed in FOR                    1:20 p.m. Work Plan Update                             following Web site: http://cab.srs.gov/
                                                  FURTHER INFORMATION CONTACT. Written                    1:30 p.m. Combined Committees                          srs-cab.html.
                                                  statements that do not pertain to a                       Session
                                                                                                                                                                   Issued at Washington, DC, on December 31,
                                                  scheduled meeting of the Board may be                     Order of committees:                                 2015.
                                                  submitted at any time. However, if                        • Facilities Disposition & Site                      LaTanya R. Butler,
                                                  individual comments pertain to a                            Remediation                                        Deputy Committee Management Officer.
                                                  specific topic being discussed at the                     • Administrative & Outreach                          [FR Doc. 2015–33316 Filed 1–5–16; 8:45 am]
                                                  planned meeting, then these statements                    • Nuclear Materials                                  BILLING CODE 6450–01–P
                                                  must be received at least 5 calendar                      • Waste Management
                                                  days prior to the meeting, otherwise, the                 • Strategic & Legacy Management
                                                  comments may not be provided to or                      4:45 p.m. Public Comments                              DEPARTMENT OF ENERGY
                                                  considered by the Board until a later                   5:00 p.m. Adjourn
                                                  date. The Designated Federal Officer                                                                           [Certification Notice—237]
                                                  will compile all timely submissions                     Tuesday, January 26, 2016
                                                  with the Board’s Chair and ensure such                  8:30 a.m. Opening, Chair Update, and                   Notice of Filing of Self-Certification of
                                                  submissions are provided to Board                          Agenda Review                                       Coal Capability Under the Powerplant
                                                  Members before the meeting.                             9:15 a.m. Agency Updates                               and Industrial Fuel Use Act
                                                    Dated: December 31, 2015.                             10:00 a.m. Public Comments                             AGENCY: Office of Electricity Delivery
                                                  Aaron Siegel,                                           10:15 a.m. Administrative & Outreach                   and Energy Reliability, DOE.
                                                  Alternate OSD Federal Register Liaison                     Committee Report
                                                                                                                                                                 ACTION: Notice of filing.
                                                  Officer, Department of Defense.                         10:30 a.m. Break
                                                  [FR Doc. 2015–33243 Filed 1–5–16; 8:45 am]
                                                                                                          10:45 a.m. Facilities Disposition & Site               SUMMARY:    On December 17, 2015, CPV
                                                                                                             Remediation Committee Report                        Towantic, LLC, as owner and operator
                                                  BILLING CODE 5001–06–P
                                                                                                          11:15 a.m. Public Comments                             of a new base load electric powerplant,
                                                                                                          11:30 a.m. Lunch Break                                 submitted a coal capability self-
                                                                                                          1:00 p.m. Waste Management                             certification to the Department of
                                                  DEPARTMENT OF ENERGY                                       Committee Report                                    Energy (DOE) pursuant to § 201(d) of the
                                                                                                          1:30 p.m. Nuclear Materials Committee                  Powerplant and Industrial Fuel Use Act
                                                  Environmental Management Site-                             Report                                              of 1978 (FUA), as amended, and DOE
                                                  Specific Advisory Board, Savannah                       2:15 p.m. Public Comments                              regulations in 10 CFR 501.60, 61. FUA
                                                  River Site                                              2:30 p.m. Break                                        and regulations thereunder require DOE
                                                                                                          2:45 p.m. Strategic & Legacy                           to publish a notice of filing of self-
                                                  AGENCY:    Department of Energy.                           Management Committee Report                         certification in the Federal Register. 42
                                                  ACTION:   Notice of open meeting.                       4:45 p.m. Announcement of 2016                         U.S.C. 8311(d) and 10 CFR 501.61(c).
                                                                                                             Committee Chairs
                                                                                                                                                                 ADDRESSES: Copies of coal capability
                                                  SUMMARY:   This notice announces a                      5:00 p.m. Adjourn
                                                                                                                                                                 self-certification filings are available for
                                                  meeting of the Environmental                               Public Participation: The EM SSAB,                  public inspection, upon request, in the
                                                  Management Site-Specific Advisory                       Savannah River Site, welcomes the                      Office of Electricity Delivery and Energy
                                                  Board (EM SSAB), Savannah River Site.                   attendance of the public at its advisory               Reliability, Mail Code OE–20, Room
                                                  The Federal Advisory Committee Act                      committee meetings and will make                       8G–024, Forrestal Building, 1000
                                                  (Pub. L. 92–463, 86 Stat. 770) requires                 every effort to accommodate persons                    Independence Avenue SW.,
                                                  that public notice of this meeting be                   with physical disabilities or special                  Washington, DC 20585.
                                                  announced in the Federal Register.                      needs. If you require special
                                                                                                                                                                 FOR FURTHER INFORMATION CONTACT:
                                                                                                          accommodations due to a disability,
                                                  DATES:                                                                                                         Christopher Lawrence at (202) 586–
                                                                                                          please contact James Giusti at least
                                                  Monday, January 25, 2016 1:00 p.m.–                     seven days in advance of the meeting at                5260.
                                                    5:00 p.m.                                             the phone number listed above. Written                 SUPPLEMENTARY INFORMATION:      Title II of
                                                  Tuesday, January 26, 2016 8:30 a.m.–                    statements may be filed with the Board                 FUA, as amended (42 U.S.C. 8301 et
                                                    5:00 p.m.                                             either before or after the meeting.                    seq.), provides that no new base load
                                                  ADDRESSES: New Ellenton Community                       Individuals who wish to make oral                      electric powerplant may be constructed
                                                  Center, 212 Pine Hill Avenue, New                       statements pertaining to agenda items                  or operated without the capability to use
                                                  Ellenton, SC 29809.                                     should contact James Giusti’s office at                coal or another alternate fuel as a
                                                                                                          the address or telephone listed above.                 primary energy source. Pursuant to FUA
                                                  FOR FURTHER INFORMATION CONTACT:                        Requests must be received five days                    in order to meet the requirement of coal
                                                  James Giusti, Office of External Affairs,               prior to the meeting and reasonable                    capability, the owner or operator of such
                                                  Department of Energy, Savannah River                    provision will be made to include the                  a facility proposing to use natural gas or
                                                  Operations Office, P.O. Box A, Aiken,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          presentation in the agenda. The Deputy                 petroleum as its primary energy source
                                                  SC 29802; Phone: (803) 952–7684.                        Designated Federal Officer is                          shall certify to the Secretary of Energy
                                                  SUPPLEMENTARY INFORMATION:   Purpose of                 empowered to conduct the meeting in a                  (Secretary) prior to construction, or
                                                  the Board: The purpose of the Board is                  fashion that will facilitate the orderly               prior to operation as a base load electric
                                                  to make recommendations to DOE–EM                       conduct of business. Individuals                       powerplant, that such powerplant has
                                                  and site management in the areas of                     wishing to make public comments will                   the capability to use coal or another
                                                  environmental restoration, waste                        be provided a maximum of five minutes                  alternate fuel. Such certification
                                                  management, and related activities.                     to present their comments.                             establishes compliance with FUA


                                             VerDate Sep<11>2014   17:32 Jan 05, 2016   Jkt 238001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\06JAN1.SGM   06JAN1


                                                                               Federal Register / Vol. 81, No. 3 / Wednesday, January 6, 2016 / Notices                                                       471

                                                  section 201(a) as of the date it is filed               listed as a contact for an intervenor                  one new 100-foot-long by 65-foot-wide
                                                  with the Secretary. 42 U.S.C. 8311.                     must create and validate an                            tailrace; (4) a new 50-foot-long by 45-
                                                     The following owner of a proposed                    eRegistration account using the                        foot-wide substation; (5) a new 2-mile-
                                                  new base load electric powerplant has                   eRegistration link. Select the eFiling                 long, 69-kilovolt transmission line; and
                                                  filed a self-certification of coal-                     link to log on and submit the                          (6) appurtenant facilities. The project
                                                  capability with DOE pursuant to FUA                     intervention or protests.                              would have an estimated annual
                                                  section 201(d) and in accordance with                      Persons unable to file electronically               generation of 34 gigawatt-hours.
                                                  DOE regulations in 10 CFR 501.60, 61:                   should submit an original and 5 copies                    Applicant Contact: Mr. Ander
                                                  OWNER: CPV Towantic, LLC                                of the intervention or protest to the                  Gonzalez, 2655 Le Jeune Road, Suite
                                                  CAPACITY: 785 megawatts (MW)                            Federal Energy Regulatory Commission,                  804, Coral Gables, Florida 33134;
                                                  PLANT LOCATION: CPV Towantic                            888 First Street NE., Washington, DC                   telephone (954) 248–8425.
                                                     Energy Center, 16 Woodruff Hill                      20426.                                                    FERC Contact: Tyrone A. Williams,
                                                     Road, Oxford, CT 06478                                  The filings in the above-referenced                 (202) 502–6331.
                                                  IN-SERVICE DATE: May 1, 2018                            proceeding are accessible in the                          Deadline for filing comments, motions
                                                                                                          Commission’s eLibrary system by                        to intervene, competing applications
                                                    Issued in Washington, DC, on December                                                                        (without notices of intent), or notices of
                                                  30, 2015.                                               clicking on the appropriate link in the
                                                                                                          above list. They are also available for                intent to file competing applications: 60
                                                  Christopher Lawrence,                                                                                          days from the issuance of this notice.
                                                                                                          electronic review in the Commission’s
                                                  Electricity Policy Analyst, Office of Electricity                                                              Competing applications and notices of
                                                  Delivery and Energy Reliability.
                                                                                                          Public Reference Room in Washington,
                                                                                                          DC. There is an eSubscription link on                  intent must meet the requirements of 18
                                                  [FR Doc. 2015–33317 Filed 1–5–16; 8:45 am]                                                                     CFR 4.36. The Commission strongly
                                                                                                          the Web site that enables subscribers to
                                                  BILLING CODE 6450–01–P
                                                                                                          receive email notification when a                      encourages electronic filing. Please file
                                                                                                          document is added to a subscribed                      comments, motions to intervene, notices
                                                                                                          docket(s). For assistance with any FERC                of intent, and competing applications
                                                  DEPARTMENT OF ENERGY                                                                                           using the Commission’s eFiling system
                                                                                                          Online service, please email
                                                                                                          FERCOnlineSupport@ferc.gov, or call                    at http://www.ferc.gov/docs-filing/
                                                  Federal Energy Regulatory
                                                                                                          (866) 208–3676 (toll free). For TTY, call              efiling.asp. Commenters can submit
                                                  Commission
                                                                                                          (202) 502–8659.                                        brief comments up to 6,000 characters,
                                                  [Docket No. ER16–612–000]                                                                                      without prior registration, using the
                                                                                                            Dated: December 30, 2015.
                                                                                                                                                                 eComment system at http://
                                                  Greeley Energy Facility, LLC;                           Nathaniel J. Davis, Sr.,                               www.ferc.gov/docs-filing/
                                                  Supplemental Notice That Initial                        Deputy Secretary.                                      ecomment.asp. You must include your
                                                  Market-Based Rate Filing Includes                       [FR Doc. 2015–33232 Filed 1–5–16; 8:45 am]             name and contact information at the end
                                                  Request for Blanket Section 204                         BILLING CODE 6717–01–P                                 of your comments. For assistance,
                                                  Authorization                                                                                                  please contact FERC Online Support at
                                                                                                                                                                 FERCOnlineSupport@ferc.gov, (866)
                                                    This is a supplemental notice in the                  DEPARTMENT OF ENERGY                                   208–3676 (toll free), or (202) 502–8659
                                                  above-referenced proceeding of Greeley
                                                                                                                                                                 (TTY). In lieu of electronic filing, please
                                                  Energy Facility, LLC’s application for                  Federal Energy Regulatory                              send a paper copy to: Secretary, Federal
                                                  market-based rate authority, with an                    Commission                                             Energy Regulatory Commission, 888
                                                  accompanying rate tariff, noting that
                                                                                                          [Project No. 14739–000]                                First Street NE., Washington, DC 20426.
                                                  such application includes a request for
                                                                                                                                                                 The first page of any filing should
                                                  blanket authorization, under 18 CFR                     Energy Resources USA Inc.; Notice of                   include docket number P–14739–000.
                                                  part 34, of future issuances of securities              Preliminary Permit Application                            More information about this project,
                                                  and assumptions of liability.                           Accepted for Filing and Soliciting                     including a copy of the application, can
                                                    Any person desiring to intervene or to                Comments, Motions To Intervene, and                    be viewed or printed on the ‘‘eLibrary’’
                                                  protest should file with the Federal                    Competing Applications                                 link of Commission’s Web site at
                                                  Energy Regulatory Commission, 888                                                                              http://www.ferc.gov/docs-filing/
                                                  First Street NE., Washington, DC 20426,                   On November 27, 2015, the Energy
                                                                                                                                                                 elibrary.asp. Enter the docket number
                                                  in accordance with Rules 211 and 214                    Resources USA Inc. filed an application
                                                                                                                                                                 (P–14739) in the docket number field to
                                                  of the Commission’s Rules of Practice                   for a preliminary permit under section
                                                                                                                                                                 access the document. For assistance,
                                                  and Procedure (18 CFR 385.211 and                       4(f) of the Federal Power Act proposing
                                                                                                                                                                 contact FERC Online Support.
                                                  385.214). Anyone filing a motion to                     to study the feasibility of the proposed
                                                  intervene or protest must serve a copy                  Coralville Dam Hydroelectric Project                     Dated: December 30, 2015.
                                                  of that document on the Applicant.                      No. 14739–000, to be located at the                    Nathaniel J. Davis, Sr.,
                                                    Notice is hereby given that the                       existing Coralville Dam on the Iowa                    Deputy Secretary.
                                                  deadline for filing protests with regard                River, near the City of Coralville, in                 [FR Doc. 2015–33237 Filed 1–5–16; 8:45 am]
                                                  to the applicant’s request for blanket                  Johnson County, Iowa. The Coralville                   BILLING CODE 6717–01–P
                                                  authorization, under 18 CFR part 34, of                 Dam is owned by the United States
                                                  future issuances of securities and                      government and operated by the U.S.
                                                  assumptions of liability, is January 19,                Army Corps of Engineers.                               DEPARTMENT OF ENERGY
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  2016.                                                     The proposed project would consist
                                                    The Commission encourages                             of: (1) A new 90-foot by 13-foot by 18-                Federal Energy Regulatory
                                                  electronic submission of protests and                   foot concrete conduit; (2) a new 70-foot               Commission
                                                  interventions in lieu of paper, using the               by 50-foot reinforced concrete
                                                                                                                                                                 Notice of Commission Staff
                                                  FERC Online links at http://                            powerhouse containing two 3.5-
                                                                                                                                                                 Attendance
                                                  www.ferc.gov. To facilitate electronic                  megawatt Kaplan hydropower turbine-
                                                  service, persons with Internet access                   generators having a total combined                       The Federal Energy Regulatory
                                                  who will eFile a document and/or be                     generating capacity of 7.0 megawatts; (3)              Commission (Commission) hereby gives


                                             VerDate Sep<11>2014   17:32 Jan 05, 2016   Jkt 238001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\06JAN1.SGM   06JAN1



Document Created: 2016-01-06 04:01:45
Document Modified: 2016-01-06 04:01:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
DatesMay 1, 2018
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation81 FR 470 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR