DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 188 (September 27, 2018)

Page Range48811-48812
FR Document2018-21068

Federal Register, Volume 83 Issue 188 (Thursday, September 27, 2018)
[Federal Register Volume 83, Number 188 (Thursday, September 27, 2018)]
[Notices]
[Pages 48811-48812]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-21068]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-145-000.
    Applicants: Choice Energy, LLC.
    Description: Amendment to August 29, 2018 Application for 
Authorization Under Section 203 of the Federal Power Act, et al. of 
Choice Energy LLC.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5066.
    Comments Due: 5 p.m. ET 10/04/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2718-031; ER10-2719-031.
    Applicants: Cogen Technologies Linden Venture, L.P., East Coast 
Power Linden Holding, L.L.C.
    Description: Notice of Non-Material Change in Status of Cogen 
Technologies Linden Venture, L.P.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5085.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-15-002.
    Applicants: Rausch Creek Generation, LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5079.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-1159-002.
    Applicants: Pioneer Transmission, LLC, Midcontinent Independent 
System Operator, Inc.
    Description: Compliance filing: 2018-09-21_Pioneer Attachment O 
Compliance Filing to be effective 6/1/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5078.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-1248-002.
    Applicants: Southern California Edison Company.
    Description: Compliance filing: SCE Compliance Filing Revised WDAT 
ER18-1248 to be effective 5/30/2018.

[[Page 48812]]

    Filed Date: 9/21/18.
    Accession Number: 20180921-5163.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2110-001.
    Applicants: Buckeye Power, Inc., PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Amendment to July 31 Filing re NITSA 
Among PJM and Buckeye Power, Inc. to be effective 10/1/2018.
    Filed Date: 9/21/2018.
    Accession Number: 20180921-5110.
    Comments Due: 5 p.m. ET 10/3/18.

    Docket Numbers: ER18-2457-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. Resource Termination--Clear River 
Unit 1.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5149.
    Comments Due: 5 p.m. ET 10/11/18.

    Docket Numbers: ER18-2458-000.
    Applicants: Duke Energy Ohio, Inc., PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Duke submits Amended and 
Restated Interconnection Agreement, SA No. 3141 to be effective 6/30/
2018.
    Filed Date: 9/20/18.
    Accession Number: 20180920-5156.
    Comments Due: 5 p.m. ET 10/11/18.

    Docket Numbers: ER18-2459-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: WAPA Work Performance 
Agreement for Cottonwood Airport Reconductoring (RS 228) to be 
effective 9/24/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5103.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2460-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 205 filing re: Use of 
constraint reliability margin values less than 20 MW to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5107.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2461-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits five ECSAs, 
Service Agreement Nos. 5112, 5113, 5116, 5130, and 5131 to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5109.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2462-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: MAIT submits five ECSAs, 
Service Agreement Nos. 5019, 5020, 5021, 5022, and 5023 to be effective 
11/21/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5159.
    Comments Due: 5 p.m. ET 10/12/18.

    Docket Numbers: ER18-2463-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2018-09-21_SA 3115 LCM-ELL 
GIA (C042) to be effective 6/10/2018.
    Filed Date: 9/21/18.
    Accession Number: 20180921-5186.
    Comments Due: 5 p.m. ET 10/12/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 21, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-21068 Filed 9-26-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                        Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices                                                 48811

                                                  The Commission strongly encourages                   Evening Scoping Meeting                               Meeting Procedures
                                               electronic filing. Please file all                                                                              The meetings will be recorded by a
                                               documents using the Commission’s                           Date and Time: Thursday, October 25,
                                                                                                       2018 at 7:00 p.m.                                     stenographer and will be placed in the
                                               eFiling system at http://www.ferc.gov/                                                                        public records of the project.
                                               docs-filing/efiling.asp. Commenters can                    Location: Errol Town Hall, 33 Main
                                               submit brief comments up to 6,000                       St., Errol, New Hampshire 03579.                        Dated: September 19, 2018.
                                               characters, without prior registration,                                                                       Kimberly D. Bose,
                                                                                                          Phone Number: (603) 482–3351.
                                               using the eComment system at http://                                                                          Secretary.
                                               www.ferc.gov/docs-filing/                                  SD1, which outlines the subject areas              [FR Doc. 2018–21055 Filed 9–26–18; 8:45 am]
                                               ecomment.asp. You must include your                     to be addressed in the environmental
                                                                                                                                                             BILLING CODE 6717–01–P
                                               name and contact information at the end                 document, was mailed to the
                                               of your comments. For assistance,                       individuals and entities on the
                                               please contact FERC Online Support at                   Commission’s mailing list. Copies of                  DEPARTMENT OF ENERGY
                                               FERCOnlineSupport@ferc.gov. In lieu of                  SD1 will be available at the scoping
                                               electronic filing, you may send a paper                 meetings, or may be viewed on the web                 Federal Energy Regulatory
                                               copy to: Secretary, Federal Energy                      at http://www.ferc.gov, using the                     Commission
                                               Regulatory Commission, 888 First Street                 ‘‘eLibrary’’ link. Follow the directions
                                                                                                       for accessing information in paragraph                Combined Notice of Filings #1
                                               NE, Washington, DC 20426. The first
                                               page of any filing should include docket                n. Based on all oral and written                         Take notice that the Commission
                                               number P–3133–032.                                      comments, a Scoping Document 2 (SD2)                  received the following electric corporate
                                                  All filings with the Commission must                 may be issued. SD2 may include a                      filings:
                                               bear the appropriate heading:                           revised process plan and schedule, as
                                                                                                                                                                Docket Numbers: EC18–145–000.
                                               ‘‘Comments on Pre-Application                           well as a list of issues, identified
                                                                                                                                                                Applicants: Choice Energy, LLC.
                                               Document,’’ ‘‘Study Requests,’’                         through the scoping process.                             Description: Amendment to August
                                               ‘‘Comments on Scoping Document 1,’’                     Environmental Site Review                             29, 2018 Application for Authorization
                                               ‘‘Request for Cooperating Agency                                                                              Under Section 203 of the Federal Power
                                               Status,’’ or ‘‘Communications to and                      The potential applicant and                         Act, et al. of Choice Energy LLC.
                                               from Commission Staff.’’ Any                            Commission staff will conduct an                         Filed Date: 9/20/18.
                                               individual or entity interested in                      Environmental Site Review of the                         Accession Number: 20180920–5066.
                                               submitting study requests, commenting                   project on Wednesday, October 24,                        Comments Due: 5 p.m. ET 10/04/18.
                                               on the PAD or SD1, and any agency                       2018, starting at 1:00 p.m. All                          Take notice that the Commission
                                               requesting cooperating status must do so                participants should meet at the Errol                 received the following electric rate
                                               by November 30, 2018.                                   Town Hall, located at: 33 Main Street,                filings:
                                                  p. Although our current intent is to                 Errol, New Hampshire 03579. All                          Docket Numbers: ER10–2718–031;
                                               prepare an environmental assessment                     participants are responsible for their                ER10–2719–031.
                                               (EA), there is the possibility that an                  own transportation. Anyone with                          Applicants: Cogen Technologies
                                               Environmental Impact Statement (EIS)                    questions about the site visit should                 Linden Venture, L.P., East Coast Power
                                               will be required. Nevertheless, this                    contact Mr. Randy Dorman with                         Linden Holding, L.L.C.
                                               notice, associated scoping meeting, and                 Brookfield Renewable at (207) 755–                       Description: Notice of Non-Material
                                               our scoping process will satisfy the                    5605.                                                 Change in Status of Cogen Technologies
                                               NEPA scoping requirements,                                                                                    Linden Venture, L.P.
                                                                                                       Meeting Objectives
                                               irrespective of whether an EA or EIS is                                                                          Filed Date: 9/21/18.
                                               issued by the Commission.                                  At the scoping meetings, staff will: (1)              Accession Number: 20180921–5085.
                                                                                                       Initiate scoping of the issues; (2) review               Comments Due: 5 p.m. ET 10/12/18.
                                               Scoping Meetings
                                                                                                       and discuss existing conditions and                      Docket Numbers: ER18–15–002.
                                                 Commission staff will hold two                        resource management objectives; (3)                      Applicants: Rausch Creek Generation,
                                               scoping meetings in the vicinity of the                 review and discuss existing information               LLC.
                                               project at the times and places noted                   and identify preliminary information                     Description: Report Filing: Refund
                                               below. The daytime meeting will focus                   and study needs; (4) review and discuss               Report to be effective N/A.
                                               on resource agency, Indian tribes, and                  the process plan and schedule for pre-                   Filed Date: 9/21/18.
                                               non-governmental organization                           filing activity that incorporates the time               Accession Number: 20180921–5079.
                                               concerns, while the evening meeting is                                                                           Comments Due: 5 p.m. ET 10/12/18.
                                                                                                       frames provided for in Part 5 of the
                                               primarily for receiving input from the                  Commission’s regulations and, to the                     Docket Numbers: ER18–1159–002.
                                               public. We invite all interested                        extent possible, maximizes coordination                  Applicants: Pioneer Transmission,
                                               individuals, organizations, and agencies                of federal, state, and tribal permitting              LLC, Midcontinent Independent System
                                               to attend one or both of the meetings,                  and certification processes; and (5)                  Operator, Inc.
                                               and to assist staff in identifying                                                                               Description: Compliance filing: 2018–
                                                                                                       discuss the appropriateness of any
                                               particular study needs, as well as the                                                                        09–21_Pioneer Attachment O
                                                                                                       federal or state agency or Indian tribe
                                               scope of environmental issues to be                                                                           Compliance Filing to be effective
                                                                                                       acting as a cooperating agency for
                                               addressed in the environmental                                                                                6/1/2018.
                                                                                                       development of an environmental                          Filed Date: 9/21/18.
                                               document. The times and locations of                    document.
                                               these meetings are as follows:                                                                                   Accession Number: 20180921–5078.
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                          Meeting participants should come                      Comments Due: 5 p.m. ET 10/12/18.
                                               Daytime Scoping Meeting                                 prepared to discuss their issues and/or                  Docket Numbers: ER18–1248–002.
                                                 Date and Time: Thursday, October 25,                  concerns. Please review the PAD in                       Applicants: Southern California
                                               2018 at 1:00 p.m.                                       preparation for the scoping meetings.                 Edison Company.
                                                 Location: Errol Town Hall, 33 Main                    Directions on how to obtain a copy of                    Description: Compliance filing: SCE
                                               St., Errol, New Hampshire 03579.                        the PAD and SD1 are included in item                  Compliance Filing Revised WDAT
                                                 Phone Number: (603) 482–3351.                         n. of this document.                                  ER18–1248 to be effective 5/30/2018.


                                          VerDate Sep<11>2014   17:20 Sep 26, 2018   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\27SEN1.SGM   27SEN1


                                               48812                    Federal Register / Vol. 83, No. 188 / Thursday, September 27, 2018 / Notices

                                                  Filed Date: 9/21/18.                                 Agreement Nos. 5019, 5020, 5021, 5022,                   d. Submitted By: Georgia Power
                                                  Accession Number: 20180921–5163.                     and 5023 to be effective 11/21/2018.                  Company (Georgia Power).
                                                  Comments Due: 5 p.m. ET 10/12/18.                       Filed Date: 9/21/18.                                  e. Name of Project: Lloyd Shoals
                                                  Docket Numbers: ER18–2110–001.                          Accession Number: 20180921–5159.                   Hydroelectric Project.
                                                  Applicants: Buckeye Power, Inc., PJM                    Comments Due: 5 p.m. ET 10/12/18.                     f. Location: The project is located on
                                               Interconnection, L.L.C.                                    Docket Numbers: ER18–2463–000.                     the Ocmulgee River in Butts, Henry,
                                                  Description: Tariff Amendment:                          Applicants: Midcontinent                           Jasper, and Newton Counties, Georgia.
                                               Amendment to July 31 Filing re NITSA                    Independent System Operator, Inc.                     No federal lands have been identified
                                               Among PJM and Buckeye Power, Inc. to                       Description: § 205(d) Rate Filing:                 within the project boundary.
                                               be effective 10/1/2018.                                 2018–09–21_SA 3115 LCM–ELL GIA                           g. Filed Pursuant to: 18 CFR part 5 of
                                                  Filed Date: 9/21/2018.                               (C042) to be effective 6/10/2018.                     the Commission’s Regulations.
                                                  Accession Number: 20180921–5110.                        Filed Date: 9/21/18.                                  h. Potential Applicant Contact:
                                                  Comments Due: 5 p.m. ET 10/3/18.                        Accession Number: 20180921–5186.                   Courtenay R. O’Mara, P.E., Hydro
                                                  Docket Numbers: ER18–2457–000.                          Comments Due: 5 p.m. ET 10/12/18.                  Licensing and Compliance Supervisor,
                                                  Applicants: ISO New England Inc.                        The filings are accessible in the                  Southern Company Generation, 241
                                                  Description: ISO New England Inc.                    Commission’s eLibrary system by                       Ralph McGill Boulevard NE, BIN 10193,
                                               Resource Termination—Clear River                        clicking on the links or querying the                 Atlanta, GA 30308–3374; (404) 506–
                                               Unit 1.                                                 docket number.                                        7219; or g2jacksonrel@southernco.com.
                                                  Filed Date: 9/20/18.                                    Any person desiring to intervene or                   i. FERC Contact: Navreet Deo at (202)
                                                  Accession Number: 20180920–5149.                     protest in any of the above proceedings               502–6304, or email at navreet.deo@
                                                  Comments Due: 5 p.m. ET 10/11/18.                    must file in accordance with Rules 211                ferc.gov.
                                                  Docket Numbers: ER18–2458–000.                       and 214 of the Commission’s                              j. Scoping Meetings: The
                                                  Applicants: Duke Energy Ohio, Inc.,                  Regulations (18 CFR 385.211 and                       Commission’s August 20, 2018, Notice
                                               PJM Interconnection, L.L.C.                             385.214) on or before 5:00 p.m. Eastern               of Commencement of Proceedings, and
                                                  Description: § 205(d) Rate Filing:                   time on the specified comment date.                   Commission staff’s Scoping Document
                                               Duke submits Amended and Restated                       Protests may be considered, but                       1, established September 13, 2018, as
                                               Interconnection Agreement, SA No.                       intervention is necessary to become a                 the date for the public scoping meetings,
                                               3141 to be effective 6/30/2018.                         party to the proceeding.                              and September 14, 2018, as the date for
                                                  Filed Date: 9/20/18.                                    eFiling is encouraged. More detailed               the environmental site review. The
                                                  Accession Number: 20180920–5156.                     information relating to filing                        Commission’s September 12, 2018,
                                                  Comments Due: 5 p.m. ET 10/11/18.                    requirements, interventions, protests,                Notice of Cancellation of Scoping and
                                                  Docket Numbers: ER18–2459–000.                       service, and qualifying facilities filings            Site Review canceled the meetings until
                                                  Applicants: Pacific Gas and Electric                 can be found at: http://www.ferc.gov/                 further notice due to Hurricane
                                               Company.                                                docs-filing/efiling/filing-req.pdf. For               Florence. With this notice, the
                                                  Description: § 205(d) Rate Filing:                   other information, call (866) 208–3676                Commission waives the regulatory
                                               WAPA Work Performance Agreement                         (toll free). For TTY, call (202) 502–8659.            deadline of scoping and site review
                                               for Cottonwood Airport Reconductoring                                                                         within 30 days of the Notice of
                                                                                                         Dated: September 21, 2018.
                                               (RS 228) to be effective 9/24/2018.                                                                           Commencement of Proceedings and
                                                                                                       Kimberly D. Bose,
                                                  Filed Date: 9/21/18.                                                                                       Scoping Document 1, and establishes
                                                                                                       Secretary.                                            the following revised dates and
                                                  Accession Number: 20180921–5103.
                                                  Comments Due: 5 p.m. ET 10/12/18.                    [FR Doc. 2018–21068 Filed 9–26–18; 8:45 am]           locations for the scoping meetings and
                                                  Docket Numbers: ER18–2460–000.                       BILLING CODE 6717–01–P                                site review:
                                                  Applicants: New York Independent                                                                           Daytime Scoping Meeting—Jackson,
                                               System Operator, Inc.                                                                                               Georgia
                                                                                                       DEPARTMENT OF ENERGY
                                                  Description: § 205(d) Rate Filing: 205                                                                        Date & Time: Tuesday, October 9,
                                               filing re: Use of constraint reliability                Federal Energy Regulatory                                   2018, at 1 p.m.
                                               margin values less than 20 MW to be                     Commission                                               Location: Pepper Sprout Barn, 562
                                               effective 11/21/2018.                                                                                               Old Bethel Road, Jackson, Georgia
                                                  Filed Date: 9/21/18.                                 [Project No. 2336–094]                                      30233, (678) 752–1550
                                                  Accession Number: 20180921–5107.                                                                           Evening Scoping Meeting—Jackson,
                                                  Comments Due: 5 p.m. ET 10/12/18.                    Georgia Power Company; Notice of
                                                                                                       Modification of Procedural Schedule                         Georgia
                                                  Docket Numbers: ER18–2461–000.                                                                                Date & Time: Tuesday, October 9,
                                                                                                       and Waiver of the Commission’s
                                                  Applicants: Mid-Atlantic Interstate                                                                              2018, at 6:30 p.m.
                                                                                                       Regulatory Deadline for Scoping and
                                               Transmission, LLC, PJM                                                                                           Location: Pepper Sprout Barn, 562
                                                                                                       Environmental Site Review
                                               Interconnection, L.L.C.                                                                                             Old Bethel Road, Jackson, Georgia
                                                  Description: § 205(d) Rate Filing:                     Take notice that the Commission’s                         30233, (678) 752–1550
                                               MAIT submits five ECSAs, Service                        regulatory deadline for scoping and
                                               Agreement Nos. 5112, 5113, 5116, 5130,                                                                        Environmental Site Review
                                                                                                       environmental site review for the
                                               and 5131 to be effective 11/21/2018.                    following hydroelectric application is                  The potential applicant and
                                                  Filed Date: 9/21/18.                                 waived, and the schedule for processing               Commission staff will conduct an
                                                  Accession Number: 20180921–5109.                     the hydroelectric application has been                environmental site review of the project
daltland on DSKBBV9HB2PROD with NOTICES




                                                  Comments Due: 5 p.m. ET 10/12/18.                    modified.                                             on Wednesday, October 10, 2018,
                                                  Docket Numbers: ER18–2462–000.                         a. Type of Filing: Notice of Intent to              consisting of facility tours from 9:00
                                                  Applicants: Mid-Atlantic Interstate                  File License Application for a New                    a.m. to 12:00 p.m., and boat tours from
                                               Transmission, LLC, PJM                                  License and Commencing Pre-filing                     1:00 p.m. to 4:00 p.m. All participants
                                               Interconnection, L.L.C.                                 Process.                                              should meet at the Jackson Land
                                                  Description: § 205(d) Rate Filing:                     b. Project No.: 2336–094.                           Management Office located at 180 Dam
                                               MAIT submits five ECSAs, Service                          c. Dated Filed: July 3, 2018.                       Road, Jackson, Georgia 30233.


                                          VerDate Sep<11>2014   17:20 Sep 26, 2018   Jkt 244001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\27SEN1.SGM   27SEN1



Document Created: 2018-09-27 01:04:21
Document Modified: 2018-09-27 01:04:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates9/20/18.
FR Citation83 FR 48811 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR