[Federal Register Volume 65, Number 5 (Friday, January 7, 2000)] [Notices] [Page 1150] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 00-401] ======================================================================= ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6249-8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared December 20, 1999 through December 23, 1999 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 9, 1999 (63 FR 17856). Draft EISs ERP No. D-AFS-L65337-ID Rating LO, Salmon River Canyon Project, Implementation, Nez Perce, Payette, Bitterroot and Salmon-Challis National Forests, Idaho County, ID. Summary: EPA Region 10 used a screening tool to conduct a limited review of this action. Based upon this screen, EPA does not foresee having any environmental objections to the proposed project. Therefore, EPA will not be conducting a detailed review. ERP No. D-BIA-A65165-00 Rating EC2, Programmatic EIS--Navajo Ten Year Forest Management Plan Alternatives, Implementation and Funding, AZ and NM. Summary: EPA expressed environmental concerns regarding water quality and protected beneficial uses. EPA asked that potential impacts associated with new road construction and use of pesticides and herbicides be addressed in the final EIS. ERP No. D-COE-C35013-00 Rating EC2, Programmatic EIS--Port of New York and New Jersey Dredged Material Management Plan, Implementation Channel Depths and Deepen, NY and NJ. Summary: EPA raised concerns with specific management options discussed in the PEIS, and requested that additional information be included in the final PEIS, Dredged Material Management Plan, and technical appendices. ERP No. D-FHW-G40154-TX Rating EC2, Loop 1 Extension Project, From Farm-to-Market (FM-734 (Palmer Lander) to TX-45 Highway, Funding, Travis and Williamson Counties, TX. Summary: EPA identified several environmental concerns and need for additional information which include the inclusion of an Edwards Aquifer water pollution abatement plan and additional documented coordination with the State Historic Preservation Officer. EPA requested that mitigation measure be incorporated into the final EIS and Record of Decision. ERP No. D-FHW-G40155-TX Rating LO, TX-45 Highway Project, Extending from Anderson Mill Road (FM Road 2769) to Farm-to-Market Road 685 east of IH-35), Funding, Williamson and Travis Counties, TX. Summary: EPA has no objection to the preferred alternative. Final EISs ERP No. F-AFS-L65311-ID North Fork St. Joe River Project, Implementation, Idaho Panhandles National Forest, St. Joe Ranger District, Shoshone County, ID. Summary: The Final EIS adequately disclosed the environmental concerns with the project and responded to EPA's comments. ERP No. F-BIA-J65298-MT Flathead Indian Reservation Forest Management Plan, Implementation, Rocky Mountain, Pablo, MT. Summary: EPA expressed concern that little information was provided on the proposed monitoring programs to assure that ecological goals and objectives are attained. ERP No. F-FHW-L40193-ID Sandpoint North and South (NH-IR-F-CM- 5116(68) Projects, Construction, US 95 (Milepost 466.8 to Milepost 4786), Funding and COE Section 404 Permit, City of Sandpoint, Bonner County, ID. Summary: EPA had no objection to the proposed action but request that the ROD include a discussion of the methodology used to determine that information in the final EIS is current and viable and that FHWA ensure that project implementation does not worsen water quality. ERP No. F-FTA-L40205-00 South/North Corridor Project, Improvements to the Existing Urban Transportation, Funding, Multnomah, Clackamas and Washington Counties, OR and Clark County, WA. Summary: No formal comment letter was sent to the preparing agency. ERP No. F-USN-E11045-NC Introduction of the V-22 ``Osprey'' a new Type of Tiltrotor Aircraft, Replacement or Renovation of the facilities used to house Aircraft, Full Basing at MCAS Cherry Point and/or Partial Basing at both MCAS New River and Cherry Point, COE Section 404 Permit, NC. Summary: EPA continues to have no significant objections to the Marine Corps' proposal to replace it CH-46 helicopters to the new Tiltrotor, V-22 Osprey. Dated: January 4, 2000. B. Katherine Biggs, Associate Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 00-401 Filed 1-6-00; 8:45 am] BILLING CODE 6560-50-U
Document
Environmental Impact Statements and Regulations; Availability of EPA Comments
EPA Region 10 used a screening tool to conduct a limited review of this action. Based upon this screen, EPA does not foresee having any environmental objections to the proposed ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
65 FR 1150
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Environmental Impact Statements and Regulations; Availability of EPA Comments,” thefederalregister.org (January 7, 2000), https://thefederalregister.org/documents/00-401/environmental-impact-statements-and-regulations-availability-of-epa-comments.