Document

Silicon Metal from Brazil: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Department of Commerce International Trade Administration [A-351-806] AGENCY: Import Administration, International Trade Administration, Department of Commerce. EFFECTIVE DATE: ...

Department of Commerce
International Trade Administration
  1. [A-351-806]

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

March 15, 2001.

FOR FURTHER INFORMATION CONTACT:

Maisha Cryor at (202) 482-5831 or Ron Trentham at (202) 482-6320, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW., Washington, DC 20230.

TIME LIMITS:

 

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department of Commerce (“the Department”) to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days and for the final determination to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.

Background

On September 6, 2000, the Department published a notice of initiation of administrative review of the antidumping duty order on Silicon Metal from Brazil, covering the period July 1, 1999 through June 30, 2000 (65 FR 53980). The preliminary results are currently due no later than April 1, 2001.

Extension of Time Limit for Preliminary Results of Review

We determine that it is not practicable to complete the preliminary results of this review within the original time limit. Therefore, the Department is extending the time limit for completion of the preliminary results until no later than July 30, 2001. See Decision Memorandum from Thomas Futtner to Holly A. Kuga, dated concurrently with this notice, which is on file in the Central Records Unit, Room B-099 of the main Commerce building. We intend to issue the final results no later than 120 days after the publication of the preliminary results notice.

This extension is in accordance with section 751(a)(3)(A) of the Act.

Dated: March 8, 2001.

Holly A. Kuga,

Acting Deputy Assistant Secretary, Import Administration, Group II.

[FR Doc. 01-6473 Filed 3-14-01; 8:45 am]

BILLING CODE 3510-DS-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

66 FR 15078

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Silicon Metal from Brazil: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review,” thefederalregister.org (March 15, 2001), https://thefederalregister.org/documents/01-6473/silicon-metal-from-brazil-extension-of-time-limit-for-preliminary-results-of-antidumping-duty-administrative-review.