Document

Dichlormid; Extension of Time-Limited Pesticide Tolerance

This regulation amends 40 CFR 180.469 by extending the expiration/revocation date of the time-limited tolerances for residues of acetamide, 2,2-dichloro-N,N-di-2-propenyl- (dich...

Environmental Protection Agency
  1. 40 CFR Part 180
  2. [EPA-HQ-OPP-2005-0477; FRL-7753-9]

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

This regulation amends 40 CFR 180.469 by extending the expiration/revocation date of the time-limited tolerances for residues of acetamide, 2,2-dichloro- N, N -di-2-propenyl- (dichlormid) in or on field corn (forage, grain, stover), pop corn (grain, stover), and sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm. The current tolerances are set to expire on December 31, 2005. This rule extends the expiration/revocation date of these time-limited tolerances to December 31, 2008.

DATES:

This regulation is effective December 28, 2005. Objections and requests for hearings must be received on or before February 27, 2006.

ADDRESSES:

To submit a written objection or hearing request follow the detailed instructions as provided in Unit IV. of the SUPPLEMENTARY INFORMATION. EPA has established a docket for this action under docket identification (ID) number EPA-HQ-OPP-2005-0477. All documents in the docket are listed on the www.regulations.gov Web site. (EDOCKET, EPA's electronic public docket and comment system was replaced on November 25, 2005, by an enhanced Federal-wide electronic docket management and comment system located at https://www.regulations.gov/​. Follow the on-line instructions.) Although listed in the index, some information is not publicly available, i.e., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically in EDOCKET or in hard copy at the Public Information and Records Integrity Branch (PIRIB), Rm. 119, Crystal Mall #2, 1801 S. Bell St., Arlington, VA. This docket facility is open from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The docket telephone number is (703) 305-5805.

FOR FURTHER INFORMATION CONTACT:

Keri Grinstead, Registration Division (7505C), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460-0001; telephone number: (703) 308-8373; e-mail address: .

SUPPLEMENTARY INFORMATION:

I. General Information

A. Does this Action Apply to Me?

You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or pesticide manufacturer. Potentially affected entities may include, but are not limited to:

This listing is not intended to be exhaustive, but rather provides a guide for readers regarding entities likely to be affected by this action. Other types of entities not listed in this unit could also be affected. The North American Industrial Classification System (NAICS) codes have been provided to assist you and others in determining whether this action might apply to certain entities. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT .

B. How Can I Access Electronic Copies of this Document and Other Related Information?

In addition to using EDOCKET (https://www.epa.gov/​edocket/​), you may access ( printed page 76698) this Federal Register document electronically through the EPA Internet under the “ Federal Register ” listings at https://www.epa.gov/​fedrgstr/​. A frequently updated electronic version of 40 CFR part 180 is available at E-CFR Beta Site Two at https://www.gpoaccess.gov/​ecfr/​.

II. Background and Statutory Findings

In a final rule published in the Federal Register on March 27, 2000 (65 FR 16143) (FRL-6498-7), EPA established time-limited tolerances under 40 CFR 180.469 for residues of dichlormid in or on field corn (forage, grain, stover), pop corn (grain, stover) at 0.05 ppm with an expiration date of March 27, 2002. On August 7, 2002, the Agency reestablished the time-limited tolerances (67 FR 51102) (FRL-7192-5) with an expiration date of December 31, 2005.

On September 30, 2004, the Agency published a final rule (69 FR 58285) (FRL-7680-8) in response to a new petition to establish time-limited tolerances for residues of dichlormid in or on sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm. An expiration/revocation date of December 31, 2005 was established for the sweet corn time-limited tolerances in order to match the same expiration date of the time-limited tolerances for field and pop corn.

Although additional studies were requested in order to complete the data set, the Agency had sufficient information to establish time-limited tolerances. EPA concluded in the final rules for the field, pop, and sweet corn time-limited tolerances that all risks were below the Agency's level of concern and there was a reasonable certainty that no harm would result to the general population and to infants and children from aggregate exposure to residues of dichlormid on corn.

The petitioner submitted the additional studies and EPA has evaluated the data. At this time, endpoints from studies do not appear to be substantially different from those of previously submitted studies. The Agency is now developing the human health risk assessment. Therefore, the Agency is extending the current time-limited tolerances for residues of dichlormid in or on field corn (forage, grain, stover), pop corn (grain, stover), and sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm with an expiration date of December 31, 2008.

The Agency may require additional information, including confirmatory studies and/or data to upgrade deficient studies, in order to complete the human health risk assessment and establish permanent tolerances. Such information may include nature of the residue studies (plants and livestock), residue analytical methods, and field accumulation in rotational crops.

III. Conclusion

The Agency, acting on its own initiative, is extending the current time-limited tolerances for residues of dichlormid in or on field corn (forage, grain, stover), pop corn (grain, stover), and sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm with an expiration/revocation date of December 31, 2008.

IV. Objections and Hearing Requests

Under section 408(g) of the Federal Food, Drug, and Cosmetic Act (FFDCA), as amended by the Food Quality Protection Act of 1996 (FQPA), any person may file an objection to any aspect of this regulation and may also request a hearing on those objections. The EPA procedural regulations which govern the submission of objections and requests for hearings appear in 40 CFR part 178. Although the procedures in those regulations require some modification to reflect the amendments made to FFDCA by FQPA, EPA will continue to use those procedures, with appropriate adjustments, until the necessary modifications can be made. The new section 408(g) of FFDCA provides essentially the same process for persons to “object” to a regulation for an exemption from the requirement of a tolerance issued by EPA under new section 408(d), as was provided in the old sections 408 and 409 of FFDCA. However, the period for filing objections is now 60 days, rather than 30 days.

A. What Do I Need to Do to File an Objection or Request a Hearing?

You must file your objection or request a hearing on this regulation in accordance with the instructions provided in this unit and in 40 CFR part 178. To ensure proper receipt by EPA, you must identify docket ID number EPA-HQ-OPP-2005-0477 in the subject line on the first page of your submission. All requests must be in writing, and must be mailed or delivered to the Hearing Clerk on or before February 27, 2006.

1. Filing the request. Your objection must specify the specific provisions in the regulation that you object to, and the grounds for the objections (40 CFR 178.25). If a hearing is requested, the objections must include a statement of the factual issue(s) on which a hearing is requested, the requestor's contentions on such issue(s), and a summary of any evidence relied upon by the objector (40 CFR 178.27). Information submitted in connection with an objection or hearing request may be claimed confidential by marking any part or all of that information as CBI. Information so marked will not be disclosed except in accordance with procedures set forth in 40 CFR part 2. A copy of the information that does not contain CBI must be submitted for inclusion in the public record. Information not marked confidential may be disclosed publicly by EPA without prior notice.

Mail your written request to: Office of the Hearing Clerk (1900L), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460-0001. You may also deliver your request to the Office of the Hearing Clerk in Suite 350, 1099 14th St., NW., Washington, DC 20005. The Office of the Hearing Clerk is open from 8 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Office of the Hearing Clerk is (202) 564-6255.

2. Copies for the Docket. In addition to filing an objection or hearing request with the Hearing Clerk as described in Unit IV.A., you should also send a copy of your request to the PIRIB for its inclusion in the official record that is described in ADDRESSES . Mail your copies, identified by docket ID number EPA-HQ-OPP-2005-0477, to: Public Information and Records Integrity Branch, Information Technology and Resource Management Division (7502C), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460-0001. In person or by courier, bring a copy to the location of the PIRIB described in ADDRESSES . You may also send an electronic copy of your request via e-mail to: . Please use an ASCII file format and avoid the use of special characters and any form of encryption. Copies of electronic objections and hearing requests will also be accepted on disks in WordPerfect 6.1/8.0 or ASCII file format. Do not include any CBI in your electronic copy. You may also submit an electronic copy of your request at many Federal Depository Libraries.

B. When Will the Agency Grant a Request for a Hearing?

A request for a hearing will be granted if the Administrator determines that the material submitted shows the following: There is a genuine and substantial issue of fact; there is a reasonable possibility that available evidence identified by the requestor would, if established resolve one or more of such issues in favor of the requestor, taking into account ( printed page 76699) uncontested claims or facts to the contrary; and resolution of the factual issue(s) in the manner sought by the requestor would be adequate to justify the action requested (40 CFR 178.32).

V. Statutory and Executive Order Reviews

This final rule establishes time-limited tolerances under section 408(d) of FFDCA. The Office of Management and Budget (OMB) has exempted these types of actions from review under Executive Order 12866, entitled Regulatory Planning and Review (58 FR 51735, October 4, 1993). Because this rule has been exempted from review under Executive Order 12866 due to its lack of significance, this rule is not subject to Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use (66 FR 28355, May 22, 2001). This final rule does not contain any information collections subject to OMB approval under the Paperwork Reduction Act (PRA), 44 U.S.C. 3501 et seq., or impose any enforceable duty or contain any unfunded mandate as described under Title II of the Unfunded Mandates Reform Act of 1995 (UMRA) (Public Law 104-4). Nor does it require any special considerations under Executive Order 12898, entitled Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations (59 FR 7629, February 16, 1994); or OMB review or any Agency action under Executive Order 13045, entitled Protection of Children from Environmental Health Risks and Safety Risks (62 FR 19885, April 23, 1997). This action does not involve any technical standards that would require Agency consideration of voluntary consensus standards pursuant to section 12(d) of the National Technology Transfer and Advancement Act of 1995 (NTTAA), Public Law 104-113, section 12(d) (15 U.S.C. 272 note). Since tolerances and exemptions that are established on the basis of FIFRA under section 408(d) of FFDCA, such as the tolerance in this final rule, do not require the issuance of a proposed rule, the requirements of the Regulatory Flexibility Act (RFA) (5 U.S.C. 601 et seq.) do not apply. In addition, the Agency has determined that this action will not have a substantial direct effect on States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132, entitled Federalism (64 FR 43255, August 10, 1999). Executive Order 13132 requires EPA to develop an accountable process to ensure “meaningful and timely input by State and local officials in the development of regulatory policies that have federalism implications.” “Policies that have federalism implications” is defined in the Executive Order to include regulations that have “substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.” This final rule directly regulates growers, food processors, food handlers and food retailers, not States. This action does not alter the relationships or distribution of power and responsibilities established by Congress in the preemption provisions of section 408(n)(4) of FFDCA. For these same reasons, the Agency has determined that this rule does not have any “tribal implications” as described in Executive Order 13175, entitled Consultation and Coordination with Indian Tribal Governments (65 FR 67249, November 6, 2000). Executive Order 13175, requires EPA to develop an accountable process to ensure “meaningful and timely input by tribal officials in the development of regulatory policies that have tribal implications.” “Policies that have tribal implications” is defined in the Executive Order to include regulations that have “substantial direct effects on one or more Indian tribes, on the relationship between the Federal Government and the Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.” This rule will not have substantial direct effects on tribal governments, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified in Executive Order 13175. Thus, Executive Order 13175 does not apply to this rule.

VI. Congressional Review Act

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of this final rule in the Federal Register . This final rule is not a “major rule” as defined by 5 U.S.C. 804(2).

List of Subjects in 40 CFR Part 180

  • Environmental protection
  • Administrative practice and procedure
  • Agricultural commodities
  • Pesticides and pests
  • Reporting and recordkeeping requirements

Dated: December 15, 2005.

Rachel C. Holloman,

Acting Director, Registration Division, Office of Pesticide Programs.

Therefore, 40 CFR chapter I is amended as follows:

PART 180—[AMENDED]

1. The authority citation for part 180 continues to read as follows:

Authority: 21 U.S.C. 321(q), 346a and 371.

2. Section 180.469 is amended by revising the table in paragraph (a) to read as follows:

Dichlormid; tolerances for residues.

(a) * * *

Commodity Parts per million Expiration/revocation date
Corn, field, forage 0.05 12/31/08
Corn, field, grain 0.05 12/31/08
Corn, field, stover 0.05 12/31/08
Corn, pop, grain 0.05 12/31/08
Corn, pop, stover 0.05 12/31/08
Corn, sweet, forage 0.05 12/31/08
Corn, sweet, kernel plus cob with husks removed 0.05 12/31/08
Corn, sweet, stover 0.05 12/31/08
* * * * *

[FR Doc. 05-24470 Filed 12-27-05; 8:45 am]

BILLING CODE 6560-50-S

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

70 FR 76697

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Dichlormid; Extension of Time-Limited Pesticide Tolerance,” thefederalregister.org (December 28, 2005), https://thefederalregister.org/documents/05-24470/dichlormid-extension-of-time-limited-pesticide-tolerance.