Document

Approval and Promulgation of Implementation Plans; South Carolina; Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards

The Environmental Protection Agency (EPA) is taking final action to approve the July 17, 2012, State Implementation Plan (SIP) submission, provided by the South Carolina Departm...

The Environmental Protection Agency (EPA) is taking final action to approve the July 17, 2012, State Implementation Plan (SIP) submission, provided by the South Carolina Department of Health and Environmental Control (SC DHEC) for inclusion into the South Carolina SIP. This final rulemaking pertains to the Clean Air Act (CAA or the Act) infrastructure requirements for the 2008 8-hour ozone national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. SC DHEC certified that the South Carolina SIP contains provisions that ensure the 2008 8-hour ozone NAAQS is implemented, enforced, and maintained in South Carolina (hereafter referred to as an ``infrastructure SIP submission''). With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting, interstate transport, and visibility protection requirements, EPA is taking final action to approve South Carolina's infrastructure SIP submission, provided to EPA on July 17, 2012, because it addresses the infrastructure elements for the 2008 8- hour ozone NAAQS.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 11136

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Approval and Promulgation of Implementation Plans; South Carolina; Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards,” thefederalregister.org (March 2, 2015), https://thefederalregister.org/documents/2015-04142/approval-and-promulgation-of-implementation-plans-south-carolina-infrastructure-requirements-for-the-2008-8-hour-ozone-n.