The Department of the Interior and the Central Utah Water Conservancy District, as joint leads, have evaluated the impacts of a proposed replacement of the Olmsted Hydroelectric Power Plant and have prepared an associated Final Environmental Assessment and Finding of No Significant Impact. Therefore, an Environmental Impact Statement is not required.
Document
Final Environmental Assessment of the Proposed Olmsted Hydroelectric Power Plant Replacement Project
The Department of the Interior and the Central Utah Water Conservancy District, as joint leads, have evaluated the impacts of a proposed replacement of the Olmsted Hydroelectric...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
80 FR 12520
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Final Environmental Assessment of the Proposed Olmsted Hydroelectric Power Plant Replacement Project,” thefederalregister.org (March 9, 2015), https://thefederalregister.org/documents/2015-05378/final-environmental-assessment-of-the-proposed-olmsted-hydroelectric-power-plant-replacement-project.