Document

Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mil...

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Bandits Race to Home 5K Marathon to cross the bridge. This deviation allows the bridge to be maintained in the closed-to-navigation position for two hours.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 18313

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL,” thefederalregister.org (April 6, 2015), https://thefederalregister.org/documents/2015-07730/drawbridge-operation-regulation-upper-mississippi-river-rock-island-il.