Document

Record of Decision; Electrical Interconnection of the Whistling Ridge Energy Project

The Bonneville Power Administration (BPA) has decided to implement its part of the Proposed Action identified in the Whistling Ridge Energy Project Final Environmental Impact St...

The Bonneville Power Administration (BPA) has decided to implement its part of the Proposed Action identified in the Whistling Ridge Energy Project Final Environmental Impact Statement (EIS) (DOE/ EIS-0419, August 2011). Under the Proposed Action, BPA will offer Whistling Ridge Energy LLC (WRE) contract terms for interconnection of WRE's planned Whistling Ridge Energy Project (Wind Project) with the FCRTS. WRE's Wind Project will be an up to 75-megawatt (MW) wind energy facility located in Skamania County, Washington. WRE has received approval to construct and operate the Wind Project from the Governor of the State of Washington, based on the recommendation of the Washington Energy Facility Site Evaluation Council (EFSEC), which is the siting authority for the Wind Project. To allow the interconnection of WRE's Wind Project to the FCRTS, BPA will construct and operate a new 230-kilovolt (kV) substation and associated facilities that will connect the Wind Project to BPA's existing North Bonneville-Midway 230-kV transmission line, which passes through the southern portion of the Wind Project site.\1\ These interconnection facilities will be located entirely within the boundaries of the Wind Project site. BPA also will execute a Large Generation Interconnection Agreement (LGIA) with WRE to provide interconnection services for the Wind Project. ---------------------------------------------------------------------------

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 41019

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Record of Decision; Electrical Interconnection of the Whistling Ridge Energy Project,” thefederalregister.org (July 14, 2015), https://thefederalregister.org/documents/2015-17087/record-of-decision-electrical-interconnection-of-the-whistling-ridge-energy-project.