Document

Approval and Promulgation of Implementation Plans; Georgia; Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards

The Environmental Protection Agency (EPA) is proposing to approve the March 6, 2012, State Implementation Plan (SIP) revision, submitted by the State of Georgia, through the Geo...

The Environmental Protection Agency (EPA) is proposing to approve the March 6, 2012, State Implementation Plan (SIP) revision, submitted by the State of Georgia, through the Georgia Department of Natural Resources' Environmental Protection Division (EPD), demonstrating that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 2008 lead national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. EPD certified that the Georgia SIP contains provisions that ensure the 2008 Lead NAAQS is implemented, enforced, and maintained in Georgia. With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting, EPA is proposing to determine that Georgia's infrastructure SIP submission, provided to EPA on March 6, 2012, addresses the required infrastructure elements for the 2008 Lead NAAQS.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 44005

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Approval and Promulgation of Implementation Plans; Georgia; Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards,” thefederalregister.org (July 24, 2015), https://thefederalregister.org/documents/2015-18096/approval-and-promulgation-of-implementation-plans-georgia-infrastructure-requirements-for-the-2008-lead-national-ambient.