Document

Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, Atlantic City, NJ

The Coast Guard has issued a temporary deviation from the operating schedules that govern the Route 30 (Absecon Boulevard) Bridge across the Beach Thorofare, Atlantic Intracoast...

The Coast Guard has issued a temporary deviation from the operating schedules that govern the Route 30 (Absecon Boulevard) Bridge across the Beach Thorofare, Atlantic Intracoastal Waterway, mile 67.2, at Atlantic City, NJ and US40-322 (North Albany Avenue) Bridge across the Inside Thorofare, Atlantic Intracoastal Waterway, mile 70.0, at Atlantic City, NJ. This deviation is necessary to facilitate the 2015 Atlantic City Beach Concerts. This deviation allows the bridges to remain in the closed-to-navigation position.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 47851

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, Atlantic City, NJ,” thefederalregister.org (August 10, 2015), https://thefederalregister.org/documents/2015-19560/drawbridge-operation-regulations-atlantic-intracoastal-waterway-atlantic-city-nj.