Document

Notice of Intent To Prepare a Draft Environmental Impact Statement for the Sacramento River Flood Control Project, California, General Reevaluation

The U.S. Army Corps of Engineers, Sacramento District (Corps), intends to prepare a draft Environmental Impact Statement (DEIS) for the general reevaluation of the Sacramento Ri...

The U.S. Army Corps of Engineers, Sacramento District (Corps), intends to prepare a draft Environmental Impact Statement (DEIS) for the general reevaluation of the Sacramento River Flood Control Project, California. The Corps will serve as the lead agency for compliance with the National Environmental Policy Act (NEPA). The general reevaluation is assessing opportunities to restore ecosystem function along the Sacramento River and improve flood risk reduction capabilities of the flood conveyance system originally constructed in 1917. The system is located along the Sacramento River, from Elder Creek near Tehama to its confluence with the San Joaquin River in the Sacramento-San Joaquin Delta near Collinsville. System features are also located along a number of tributaries, sloughs, and bypass channels, including the Feather River, American River, Sutter Bypass, and Yolo Bypass.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 64404

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Notice of Intent To Prepare a Draft Environmental Impact Statement for the Sacramento River Flood Control Project, California, General Reevaluation,” thefederalregister.org (October 23, 2015), https://thefederalregister.org/documents/2015-27032/notice-of-intent-to-prepare-a-draft-environmental-impact-statement-for-the-sacramento-river-flood-control-project-califo.