Western Area Power Administration (Western), Colorado River Storage Project Management Center (CRSP MC), a Federal power marketing agency of the Department of Energy, is seeking comments on its Proposed 2025 Marketing Plan for the Salt Lake City Area Integrated Projects (SLCA/IP). The current SLCA/IP marketing plan will expire on September 30, 2024. The Proposed General Power Marketing Criteria provides the basis for marketing the long-term, firm hydroelectric resources of the SLCA/IP to be effective October 1, 2024. The Proposed General Power Marketing Criteria for the SLCA/IP are published herein. This Federal Register notice (FRN) formally initiates Western's public process and request for public comments. Western will prepare and publish the final 2025 General Power Marketing Criteria after public comments on the criteria are considered. The Energy Planning and Management Program as set forth in 10 CFR part 905 is not specifically applicable to the SLCA/IP; however, Western used the Power Marketing Initiative outlined in Subpart C for general guidance in developing a framework for this proposal. This FRN is not a call for applications. A call for applications from those interested in an allocation of SLCA/IP power will occur in a future notice.
Document
Salt Lake City Area Integrated Projects and Colorado River Storage Project 2025 General Power Marketing Criteria
Western Area Power Administration (Western), Colorado River Storage Project Management Center (CRSP MC), a Federal power marketing agency of the Department of Energy, is seeking...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
80 FR 78222
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Salt Lake City Area Integrated Projects and Colorado River Storage Project 2025 General Power Marketing Criteria,” thefederalregister.org (December 16, 2015), https://thefederalregister.org/documents/2015-31619/salt-lake-city-area-integrated-projects-and-colorado-river-storage-project-2025-general-power-marketing-criteria.