Document

Drawbridge Operation Regulation; Upper Mississippi River, Sabula, Iowa

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sabula Railroad Drawbridge across the Upper Mississippi River, mile 535.0, at Sabul...

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sabula Railroad Drawbridge across the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation is necessary to allow the bridge owner time to perform preventive maintenance that is essential to the safe operation of the drawbridge, and is scheduled in the winter when there is less impact on navigation. This deviation allows the bridge to open on signal if at least 24-hours advance notice is given.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

80 FR 79260

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Upper Mississippi River, Sabula, Iowa,” thefederalregister.org (December 21, 2015), https://thefederalregister.org/documents/2015-31917/drawbridge-operation-regulation-upper-mississippi-river-sabula-iowa.