Document

Record of Decision for the Schofield Generating Station Project Final Environmental Impact Statement, United States Army Garrison-Hawaii

The Department of the Army announces the availability of the Record of Decision (ROD) to lease land and grant easements on Schofield Barracks and Wheeler Army Airfield to Hawaii...

The Department of the Army announces the availability of the Record of Decision (ROD) to lease land and grant easements on Schofield Barracks and Wheeler Army Airfield to Hawaiian Electric Company (Hawaiian Electric) for the construction, ownership, operation, and maintenance of a 50-megawatt (MW) capacity, biofuel-capable generating station, referred to as the Schofield Generating Station, and associated power poles, high-tension power lines, and related equipment and facilities. The action was the preferred alternative identified in the final Environmental Impact Statement (EIS) for proposed Schofield Generating Station Project (SGSP). The ROD identifies the potential environmental and socioeconomic impacts associated with the SGSP, none of which were determined to be significant adverse effects. The selected action will provide improved energy security to the Army and citizens of Oahu, support renewable energy goals, and improve future electrical generation capabilities on Oahu by providing a new secure, firm, dispatchable, flexible, and renewable energy generation to the grid on Oahu, Hawaii. Implementation of the preferred alternative will not result in significant impacts. The Army and Hawaiian Electric will implement numerous best management practices to avoid or minimize adverse environmental effects.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

81 FR 6243

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Record of Decision for the Schofield Generating Station Project Final Environmental Impact Statement, United States Army Garrison-Hawaii,” thefederalregister.org (February 5, 2016), https://thefederalregister.org/documents/2016-02041/record-of-decision-for-the-schofield-generating-station-project-final-environmental-impact-statement-united-states-army-.