The Coast Guard is establishing a temporary safety zone in the waters of the Newport Harbor Grand Canal on Balboa Island. This temporary safety zone is being established to provide for the safety of the waterway users during bridge construction over a 10 month period. Transiting through or within this temporary safety zone is prohibited unless specifically authorized by the Captain of the Port, Los Angeles--Long Beach, or her designated representative.
Document
Safety Zone; Newport Beach Harbor Grand Canal Bridge Construction; Newport Beach, CA
The Coast Guard is establishing a temporary safety zone in the waters of the Newport Harbor Grand Canal on Balboa Island. This temporary safety zone is being established to prov...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
81 FR 24024
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Safety Zone; Newport Beach Harbor Grand Canal Bridge Construction; Newport Beach, CA,” thefederalregister.org (April 25, 2016), https://thefederalregister.org/documents/2016-09518/safety-zone-newport-beach-harbor-grand-canal-bridge-construction-newport-beach-ca.