Drawbridge Operation Regulation; Mullica River, Green Bank, NJ

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Green Bank Bridge (Green Bank Road/ CR563) across the Mullica River, mile 18.0, at ...

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Green Bank Bridge (Green Bank Road/ CR563) across the Mullica River, mile 18.0, at Green Bank, NJ. The deviation is necessary to perform bridge repairs. This deviation allows the bridge to remain in the closed-to-navigation position.