Xcel Energy, Monticello Nuclear Generating Plant Independent Spent Fuel Storage Installation

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a request submitted by Xcel Energy on September 29, 2015, from meeting Technical Specificatio...

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a request submitted by Xcel Energy on September 29, 2015, from meeting Technical Specification (TS) 1.2.5 of Attachment A of Certificate of Compliance (CoC) No. 1004, Amendment No. 10, which requires that all dry shielded canister (DSC) closure welds, except those subjected to full volumetric inspection, shall be dye penetrant tested in accordance with the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code Section III, Division 1, Article NB-5000. This exemption applies to one loaded Standardized NUHOMS[supreg] 61BTH, DSC 16 (DSC 16), at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI).

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

81 FR 39069

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Xcel Energy, Monticello Nuclear Generating Plant Independent Spent Fuel Storage Installation,” thefederalregister.org (June 15, 2016), https://thefederalregister.org/documents/2016-14188/xcel-energy-monticello-nuclear-generating-plant-independent-spent-fuel-storage-installation.