The U.S. Nuclear Regulatory Commission (NRC) has finalized generic procedures for conducting hearings on whether acceptance criteria in combined licenses are met. These acceptance criteria are part of the inspections, tests, analyses, and acceptance criteria (ITAAC) included in the combined license for a nuclear reactor. Reactor operation may commence only if and after the NRC finds that these acceptance criteria are met. The Commission intends to use the final generic ITAAC hearing procedures (with appropriate modifications) in case-specific orders to govern hearings on conformance with the acceptance criteria.
Document
Final Procedures for Conducting Hearings on Conformance With the Acceptance Criteria in Combined Licenses
The U.S. Nuclear Regulatory Commission (NRC) has finalized generic procedures for conducting hearings on whether acceptance criteria in combined licenses are met. These acceptan...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
81 FR 43266
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Final Procedures for Conducting Hearings on Conformance With the Acceptance Criteria in Combined Licenses,” thefederalregister.org (July 1, 2016), https://thefederalregister.org/documents/2016-15693/final-procedures-for-conducting-hearings-on-conformance-with-the-acceptance-criteria-in-combined-licenses.