Document

Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

The Coast Guard has modified a temporary deviation from the operating schedule that governs Seattle Department of Transportation's (SDOT) Fremont Bridge, across the Lake Washing...

The Coast Guard has modified a temporary deviation from the operating schedule that governs Seattle Department of Transportation's (SDOT) Fremont Bridge, across the Lake Washington Ship Canal, mile 2.6, at Seattle, WA. The modified deviation is necessary to accommodate heavy pedestrian and cycling traffic across the bridge during the `Fun Ride' event and Lake Union 10K Run event. This modified deviation allows the bridge to remain in the closed-to-navigation position and need not open to maritime traffic.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

81 FR 50320

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA,” thefederalregister.org (August 1, 2016), https://thefederalregister.org/documents/2016-18080/drawbridge-operation-regulation-lake-washington-ship-canal-seattle-wa.