The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR- 33, DPR-52, and DPR-68 issued to Tennessee Valley Authority (TVA, the licensee) for operation of Browns Ferry Nuclear Plant, Units 1, 2, and 3 (BFN) located in Limestone County, Alabama. The proposed amendments would increase the maximum licensed thermal power level for each reactor from 3,458 megawatts thermal (MWt) to 3,952 MWt. This change, referred to as an extended power uprate (EPU), represents an increase of approximately 14.3 percent above the current licensed thermal power limit. The NRC is issuing a draft environmental assessment (EA) and draft finding of no significant impact (FONSI) for public comment associated with the proposed EPU.
Document
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR- 33, DPR-52, and DPR-68 issued to Tennessee Val...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
81 FR 86732
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3,” thefederalregister.org (December 1, 2016), https://thefederalregister.org/documents/2016-28865/tennessee-valley-authority-browns-ferry-nuclear-plant-units-1-2-and-3.