Document

Drawbridge Operation Regulation; Columbia River, Kennewick, WA

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railroad Bridge (Kennewick-Pasco Railroad Bridg...

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railroad Bridge (Kennewick-Pasco Railroad Bridge) across the Columbia River, mile 328, at Kennewick, WA. This deviation is necessary to accommodate maintenance to replace a lift motor and install span controls. This deviation allows the bridge to remain in the closed position during installation activities.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

81 FR 89862

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Columbia River, Kennewick, WA,” thefederalregister.org (December 13, 2016), https://thefederalregister.org/documents/2016-29809/drawbridge-operation-regulation-columbia-river-kennewick-wa.