Document

Washoe Project-Rate Order No. WAPA-176

The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through Sep...

The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through September 30, 2022. The existing Non-Firm Power Formula Rate Schedule SNF-7 expires on September 30, 2017. The extended formula rate will be in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) approves the extension on a final basis, or until superseded.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 1335

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Washoe Project-Rate Order No. WAPA-176,” thefederalregister.org (January 5, 2017), https://thefederalregister.org/documents/2016-31973/washoe-project-rate-order-no-wapa-176.