The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through September 30, 2022. The existing Non-Firm Power Formula Rate Schedule SNF-7 expires on September 30, 2017. The extended formula rate will be in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) approves the extension on a final basis, or until superseded.
Document
Washoe Project-Rate Order No. WAPA-176
The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through Sep...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 1335
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Washoe Project-Rate Order No. WAPA-176,” thefederalregister.org (January 5, 2017), https://thefederalregister.org/documents/2016-31973/washoe-project-rate-order-no-wapa-176.