The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an October 13, 2016, letter from Duke Energy Progress (DEP), which requested an exemption from certain regulatory requirements that requires DEP to submit an update to the final safety analysis report (FSAR) included in their combined license (COL) application for Shearon Harris Nuclear Power Plant (Harris) Units 2 and 3 by December 31, 2016. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption, but stipulated that the update to the FSAR must be submitted prior to, or coincident with the resumption of the COL application review or by December 31, 2019, whichever comes first.
Document
Duke Energy Progress; Combined License Application for Shearon Harris Nuclear Power Plant Units 2 and 3
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an October 13, 2016, letter from Duke Energy Progress (DEP), which requested an exemption fro...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 5611
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Duke Energy Progress; Combined License Application for Shearon Harris Nuclear Power Plant Units 2 and 3,” thefederalregister.org (January 18, 2017), https://thefederalregister.org/documents/2017-01035/duke-energy-progress-combined-license-application-for-shearon-harris-nuclear-power-plant-units-2-and-3.