Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL

The Coast Guard proposes to modify the operating schedule of four bridges across the Gulf Intracoastal Waterway; Stickney Point, mile 68.6, Siesta Drive, mile 71.6, Cortez, mile...

The Coast Guard proposes to modify the operating schedule of four bridges across the Gulf Intracoastal Waterway; Stickney Point, mile 68.6, Siesta Drive, mile 71.6, Cortez, mile, 87.4 and Anna Maria, mile 89.2, Drawbridges, Sarasota, FL. The request was made to the Coast Guard to change the operation of four drawbridges due to an increase in vehicle traffic throughout these areas at all times of the year. This proposed rulemaking would change the bridges' operating schedule from a three times an hour opening schedule to a twice an hour opening schedule throughout the year.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 10444

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL,” thefederalregister.org (February 13, 2017), https://thefederalregister.org/documents/2017-02896/drawbridge-operation-regulation-gulf-intracoastal-waterway-sarasota-fl.