Document

Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC

The Coast Guard has issued a temporary deviation from the operating schedule that governs the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsvil...

The Coast Guard has issued a temporary deviation from the operating schedule that governs the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsville Beach, NC. The deviation is necessary to accommodate the free movement of pedestrians and vehicles during the 8th Annual Wrightsville Beach Marathon. This deviation allows the bridge to remain in the closed-to-navigation position.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 11148

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC,” thefederalregister.org (February 21, 2017), https://thefederalregister.org/documents/2017-03372/drawbridge-operation-regulation-atlantic-intracoastal-waterway-wrightsville-beach-nc.