The Coast Guard has issued a temporary deviation from the operating schedule that governs the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsville Beach, NC. The deviation is necessary to accommodate the free movement of pedestrians and vehicles during the 8th Annual Wrightsville Beach Marathon. This deviation allows the bridge to remain in the closed-to-navigation position.
Document
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC
The Coast Guard has issued a temporary deviation from the operating schedule that governs the S.R. 74 Bridge across the Atlantic Intracoastal Waterway, mile 283.1, at Wrightsvil...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 11148
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Wrightsville Beach, NC,” thefederalregister.org (February 21, 2017), https://thefederalregister.org/documents/2017-03372/drawbridge-operation-regulation-atlantic-intracoastal-waterway-wrightsville-beach-nc.