Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; South Carolina Public Service Authority Relocation of Air Cooled Chiller Pump 3, VWS-MP-03

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic AP1000 design control docu...

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic AP1000 design control document (DCD) and is issuing License Amendment No. 62 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric & Gas Company and the South Carolina Public Service Authority, (both collectively referred to as the licensee) for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 20500

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; South Carolina Public Service Authority Relocation of Air Cooled Chiller Pump 3, VWS-MP-03,” thefederalregister.org (May 2, 2017), https://thefederalregister.org/documents/2017-08844/virgil-c-summer-nuclear-station-units-2-and-3-south-carolina-electric-and-gas-company-south-carolina-public-service-auth.