Document

Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Matanzas River, St. Augustine, FL

The Coast Guard has issued a temporary deviation from the operating schedule and vertical clearance that governs the Crescent Beach Bridge (SR 206) across the Atlantic Intracoas...

The Coast Guard has issued a temporary deviation from the operating schedule and vertical clearance that governs the Crescent Beach Bridge (SR 206) across the Atlantic Intracoastal Waterway (Matanzas River), mile 788.6, at St. Augustine, Florida. The temporary deviation is necessary to complete rehabilitation work on the bridge. This temporary deviation allows the bridge single-leaf operations on a schedule with an advanced notice for a double-leaf opening and a two foot reduction in the vertical clearance of the bridge. This action is intended to allow for the contractor to conduct necessary rehabilitation work on the bascule spans with little to no effect on navigation.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 39955

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Matanzas River, St. Augustine, FL,” thefederalregister.org (August 23, 2017), https://thefederalregister.org/documents/2017-17819/drawbridge-operation-regulation-atlantic-intracoastal-waterway-matanzas-river-st-augustine-fl.