The Coast Guard is modifying the operating schedule of four bridges across the Gulf Intracoastal Waterway (GICW); Stickney Point Drawbridge, mile 68.6, Siesta Drive Drawbridge, mile 71.6, Cortez Drawbridge, mile, 87.4, and Anna Maria Drawbridge, mile 89.2, in Sarasota, FL. The request was made to the Coast Guard to change the operation of four drawbridges due to an increase in vehicle traffic throughout these areas at all times of the year. This rulemaking would change the bridges' operating schedules from a three times an hour opening schedule to a twice an hour opening schedule throughout the year.
Document
Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL
The Coast Guard is modifying the operating schedule of four bridges across the Gulf Intracoastal Waterway (GICW); Stickney Point Drawbridge, mile 68.6, Siesta Drive Drawbridge, ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 41891
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL,” thefederalregister.org (September 5, 2017), https://thefederalregister.org/documents/2017-18710/drawbridge-operation-regulation-gulf-intracoastal-waterway-sarasota-fl.