Document

Drawbridge Operation Regulation; Isthmus Slough, Coos Bay, OR

The Coast Guard proposes to change the operating schedule that governs the Oregon State secondary highway bridge (Isthmus Slough Bridge), across Isthmus Slough, mile 1.0, at Coo...

The Coast Guard proposes to change the operating schedule that governs the Oregon State secondary highway bridge (Isthmus Slough Bridge), across Isthmus Slough, mile 1.0, at Coos Bay, OR. To accommodate Oregon Department of Transportation's (ODOT) preservation, painting and replacement of the bridge equipment, the Coast Guard proposes to operate half the double bascule span (single leaf). Additionally, during the period of this work, the non-functioning leaf of the span's vertical clearance will be reduced.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

82 FR 49153

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulation; Isthmus Slough, Coos Bay, OR,” thefederalregister.org (October 24, 2017), https://thefederalregister.org/documents/2017-23052/drawbridge-operation-regulation-isthmus-slough-coos-bay-or.