The Coast Guard has issued a temporary deviation from the operating schedule that governs the US1 Bridge across the Merrimack River, mile 3.4, at Newburyport, MA. The deviation is necessary to replace the electrical power and control systems which are at the end of their life cycle. This deviation allows the bridge to be closed to navigation.
Document
Drawbridge Operation Regulation; Merrimack River, Newburyport, MA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the US1 Bridge across the Merrimack River, mile 3.4, at Newburyport, MA. The deviation ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 60674
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Drawbridge Operation Regulation; Merrimack River, Newburyport, MA,” thefederalregister.org (December 22, 2017), https://thefederalregister.org/documents/2017-27642/drawbridge-operation-regulation-merrimack-river-newburyport-ma.