The Coast Guard has issued a temporary deviation from the operating schedule that governs the Frederick Douglass Memorial Bridge across the Anacostia River, mile 1.2, at Washington, DC. The deviation is necessary to accommodate the construction and replacement of the existing Frederick Douglass Memorial Bridge with a fixed bridge on an alignment 18 feet south of the existing bridge. The current Frederick Douglass Memorial Bridge will be removed in its entirety. This deviation allows the bridge to remain in the closed-to-navigation position during construction.
Document
Drawbridge Operation Regulation; Anacostia River, Washington, DC
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Frederick Douglass Memorial Bridge across the Anacostia River, mile 1.2, at Washing...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
83 FR 4845
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Drawbridge Operation Regulation; Anacostia River, Washington, DC,” thefederalregister.org (February 2, 2018), https://thefederalregister.org/documents/2018-02082/drawbridge-operation-regulation-anacostia-river-washington-dc.