The U.S. Army Corps of Engineers (USACE) is preparing an Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of a proposed water supply project, the Cedar Ridge Reservoir, proposed by the City of Abilene, TX. A Clean Water Act Section 404 permit would be required for the construction and operation of the proposed Project since it would result in permanent and temporary impacts to waters of the United States. The Project, as proposed by the applicant, is intended to provide approximately 34,400 acre-feet of new reliable water supply to address additional water supply needs. The Cedar Ridge Project would be a non-federal project constructed, owned, and operated by the City of Abilene.
Document
Intent To Prepare an Environmental Impact Statement for the City of Abilene, Texas, Cedar Ridge Reservoir Water Supply Project
The U.S. Army Corps of Engineers (USACE) is preparing an Environmental Impact Statement (EIS) to analyze the direct, indirect, and cumulative effects of a proposed water supply ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
83 FR 16061
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Intent To Prepare an Environmental Impact Statement for the City of Abilene, Texas, Cedar Ridge Reservoir Water Supply Project,” thefederalregister.org (April 13, 2018), https://thefederalregister.org/documents/2018-07303/intent-to-prepare-an-environmental-impact-statement-for-the-city-of-abilene-texas-cedar-ridge-reservoir-water-supply-pro.