Procedures for Conducting Electric Transmission Congestion Studies

The Federal Power Act (FPA) requires the Department of Energy (Department or DOE) to complete a study, in consultation with affected states, of electric transmission congestion ...

The Federal Power Act (FPA) requires the Department of Energy (Department or DOE) to complete a study, in consultation with affected states, of electric transmission congestion every three years. DOE has issued three previous congestion studies, in August 2006, December 2009, and September 2015. The forthcoming Congestion Study will be of a similar scope. DOE expects to release its next triennial study in 2019 for a 45- day comment period. After reviewing and considering the comments received, DOE will publish a report concerning whether it will propose any National Corridors on the basis of the study. Interested persons may submit comments in response to this notice in the manner indicated in the ADDRESSES section.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

83 FR 42647

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Procedures for Conducting Electric Transmission Congestion Studies,” thefederalregister.org (August 23, 2018), https://thefederalregister.org/documents/2018-18229/procedures-for-conducting-electric-transmission-congestion-studies.