The Federal Power Act (FPA) requires the Department of Energy (Department or DOE) to complete a study, in consultation with affected states, of electric transmission congestion every three years. DOE has issued three previous congestion studies, in August 2006, December 2009, and September 2015. The forthcoming Congestion Study will be of a similar scope. DOE expects to release its next triennial study in 2019 for a 45- day comment period. After reviewing and considering the comments received, DOE will publish a report concerning whether it will propose any National Corridors on the basis of the study. Interested persons may submit comments in response to this notice in the manner indicated in the ADDRESSES section.
Document
Procedures for Conducting Electric Transmission Congestion Studies
The Federal Power Act (FPA) requires the Department of Energy (Department or DOE) to complete a study, in consultation with affected states, of electric transmission congestion ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
83 FR 42647
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Procedures for Conducting Electric Transmission Congestion Studies,” thefederalregister.org (August 23, 2018), https://thefederalregister.org/documents/2018-18229/procedures-for-conducting-electric-transmission-congestion-studies.