Document

Disposition of Information Related to the Time Period That Safety-Related Structures, Systems, or Components Are Installed

The U.S. Nuclear Regulatory Commission (NRC) is withdrawing draft regulatory issue summary, ``Disposition of Information Related to the Time Period that Safety-Related Structure...

The U.S. Nuclear Regulatory Commission (NRC) is withdrawing draft regulatory issue summary, ``Disposition of Information Related to the Time Period that Safety-Related Structures, Systems or Components are Installed,'' which was published for public comment in the Federal Register on May 17, 2016. This document is being withdrawn because public interactions to date between NRC staff and industry have adequately communicated the issues identified by the staff to the industry. The NRC will continue to follow up on these issues via the reactor oversight process.

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

83 FR 46199

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Disposition of Information Related to the Time Period That Safety-Related Structures, Systems, or Components Are Installed,” thefederalregister.org (September 12, 2018), https://thefederalregister.org/documents/2018-19800/disposition-of-information-related-to-the-time-period-that-safety-related-structures-systems-or-components-are-installed.