On July 13, 2018, the U.S. Nuclear Regulatory Commission (NRC) published a request for public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Branch Technical Position (BTP) 5-3, ``Fracture Toughness Requirements.'' The public comment period was originally scheduled to close on September 11, 2018. The NRC has decided to reopen the public comment period on this document for 30 days to allow more time for members of the public to review additional revisions that the NRC made to BTP 5-3 since the draft was issued on July 13, 2018, and to assemble and submit their comments.
Document
Proposed Revisions to Branch Technical Position 5-3: Fracture Toughness Requirements
On July 13, 2018, the U.S. Nuclear Regulatory Commission (NRC) published a request for public comment on draft NUREG-0800, ``Standard Review Plan for the Review of Safety Analys...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
83 FR 47647
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Proposed Revisions to Branch Technical Position 5-3: Fracture Toughness Requirements,” thefederalregister.org (September 20, 2018), https://thefederalregister.org/documents/2018-20451/proposed-revisions-to-branch-technical-position-5-3-fracture-toughness-requirements.