The Federal Energy Regulatory Commission (Commission) approves Reliability Standard TPL-007-2 (Transmission System Planned Performance for Geomagnetic Disturbance Events). The North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization, submitted Reliability Standard TPL- 007-2 for Commission approval. The Commission also directs NERC to develop and submit modifications to Reliability Standard TPL-007-2: To require the development and implementation of corrective action plans to mitigate assessed supplemental GMD event vulnerabilities; and to authorize extensions of time to implement corrective action plans on a case-by-case basis. In addition, the Commission accepts the revised GMD research work plan submitted by NERC.
Document
Geomagnetic Disturbance Reliability Standard; Reliability Standard for Transmission System Planned Performance for Geomagnetic Disturbance Events
The Federal Energy Regulatory Commission (Commission) approves Reliability Standard TPL-007-2 (Transmission System Planned Performance for Geomagnetic Disturbance Events). The N...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
83 FR 60347
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Geomagnetic Disturbance Reliability Standard; Reliability Standard for Transmission System Planned Performance for Geomagnetic Disturbance Events,” thefederalregister.org (November 26, 2018), https://thefederalregister.org/documents/2018-25678/geomagnetic-disturbance-reliability-standard-reliability-standard-for-transmission-system-planned-performance-for-geomag.