[Federal Register Volume 61, Number 1 (Tuesday, January 2, 1996)] [Notices] [Pages 65-66] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 95-31532] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket Nos. CP95-668-000 and CP95-668-001] CNG Transmission Corporation and Texas Eastern Transmission Corporation; Notice of Availability of the Environmental Assessment for the Proposed South Oakford Project December 26, 1995. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) on the natural gas facilities proposed by CNG Transmission Corporation (CNG) and Texas Eastern Transmission Corporation (Texas Eastern) in the above-referenced dockets. The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The EA assesses the potential environmental effects of the construction and operation of the South Oakford Project. The proposed facilities include: • 10,000 hp of electric motor-driven compression and related facilities at the South Oakford Compressor Station in Westmoreland County, Pennsylvania; • A pig receiver and barrel drip at the Earhart Gate; • 3,158 feet of 30-inch-diameter storage suction pipeline (Line JP-296) between the South Oakford Compressor Station and the South Oakford Gate; • 3,158 feet of 16-inch-diameter storage discharge pipeline (Line JP-297) between the South Oakford Compressor Station and the South Oakford Gate; [[Page 66]] • A drip on the new suction pipeline; and • Facilities to interconnect new Lines JP-296 and JP-297 to existing Lines JP-250 and JP-40, respectively, at the South Oakford Gate. The EA also addresses the potential environmental effects of the proposed abandonment of facilities including: • All buildings, parking lots, driveways, equipment, piping, and 7,980 horsepower (hp) of compression at the Jeannette Compressor Station; • A pig receiver and barrel drip at the Huff Gate near the Jeannette Compressor Station (to be removed and installed at Earhart Gate); • 75 feet of Line JP-40 within the Earhart Gate; and • A 20-inch mainline gate setting (250-IM) for Line JP-250 at the Earhart Gate. The purpose of the proposed facilities would be to improve safety, reliability, and flexibility in the operation of the Oakford Storage Field. There would be no increase in the amount of gas stored in the Oakford Storage Field as a result of construction of the proposed facilities. Presently, the Jeannette Compressor Station delivers gas out of the Oakford Storage Field, recovers migrating gas, and re- injects recovered gas into the storage pool. With the addition of the proposed compression and related facilities at the existing South Oakford Compressor Station, the recovery operation performed by the Jeannette Compressor Station would continue with facilities consolidated at one location. The EA has been placed in the public files of the FERC and is available for public inspection at: Federal Energy Regulatory Commission, Public Reference and Files Maintenance Branch, 888 First Street NE., Washington, DC 20426, (202) 208-1371. Copies of the EA have been mailed to Federal, State and local agencies, public interest groups, interested individuals, newspapers, and parties to this proceeding. A limited number of copies of the EA are available from: Ms. Jennifer Goggin, Environmental Project Manager, Environmental Review and Compliance Branch II, Office of Pipeline Regulation, 888 First Street NE., PR 11.2, Washington, DC 20426, (202) 208-2226. Any person wishing to comment on the EA may do so. Written comments must reference Docket No. CP95-668-000 and be addressed to: Office of the Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Comments should be filed as soon as possible, but must be received no later than January 26, 1996, to ensure consideration prior to a Commission decision on this proposal. A copy of any comments should also be sent to Ms. Jennifer Goggin, Environmental Project Manager, at the above address. Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.214). The date for filing timely motions to intervene in this proceeding has passed. Therefore, parties now seeking to file late interventions must show good cause, as required by section 385.214(b)(3), why this time limitation should be waived. Environmental issues have been viewed as good cause for late intervention. You do not need intervenor status to have your comments considered. Additional information about this project is available from Ms. Jennifer Goggin, Environmental Project Manager. Lois D. Cashell, Secretary. [FR Doc. 95-31532 Filed 12-29-95; 8:45 am] BILLING CODE 6717-01-M
Document
CNG Transmission Corporation and Texas Eastern Transmission Corporation; Notice of Availability of the Environmental Assessment for the Proposed South Oakford Project
[Federal Register Volume 61, Number 1 (Tuesday, January 2, 1996)] [Notices] [Pages 65-66] From the Federal Register Online via the Government Publishing Office [ www.gpo.gov ] [...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
61 FR 65
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“CNG Transmission Corporation and Texas Eastern Transmission Corporation; Notice of Availability of the Environmental Assessment for the Proposed South Oakford Project,” thefederalregister.org (January 2, 1996), https://thefederalregister.org/documents/95-31532/cng-transmission-corporation-and-texas-eastern-transmission-corporation-notice-of-availability-of-the-environmental-asse.