[Federal Register Volume 61, Number 181 (Tuesday, September 17, 1996)] [Notices] [Pages 48931-48933] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-23766] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. EG96-90-000, et al.] LSP-Whitewater, L.P., et al.; Electric Rate and Corporate Regulation Filings September 10, 1996. Take notice that the following filings have been made with the Commission: 1. LSP-Whitewater, L.P. [Docket No. EG96-90-000] On September 4, 1996, LSP-Whitewater, L.P. (``Applicant''), a Delaware limited partnership with its principal place of business at Two Tower Center, 10th Floor, East Brunswick, NJ 08816, filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations. Applicant states that it is in the process of constructing a combined-cycle gas-fired cogeneration facility (``the Facility'') in the City of Whitewater, Wisconsin. According to Applicant, the Facility is scheduled to commence commercial operation by June 1, 1997. Applicant states that the Facility is designed to generate approximately 245 megawatts of [[Page 48932]] electrical capacity measured at summer conditions. Comment date: September 30, 1996, in accordance with Standard Paragraph E at the end of this notice. 2. LSP-Cottage Grove, L.P. [Docket No. EG96-91-000] On September 4, 1996, LSP-Cottage Grove, L.P. (``Cottage Grove''), a Delaware limited partnership with its principal place of business at 402 East Main Street, Bozeman, Montana 59715, filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations. Cottage Grove states that it is in the process of constructing a dispatchable, combined-cycle natural gas-fired (with fuel oil back-up) cogeneration facility designed to generate approximately 245 megawatts of electrical capacity measured at summer conditions, and 262 megawatts of electrical capacity at winter conditions in Cottage Grove, Minnesota (the ``Facility''). Cottage Grove further states that the Facility will also produce a maximum of 190,000 pounds per hour of steam for sale. According to Cottage Grove, the Facility is scheduled to commence commercial operation by May 31, 1997. Cottage Grove states that most of the electrical capacity and energy from the Facility will be directly sold by Cottage Grove to Northern States Power Company (``NSP'') pursuant to a power purchase agreement dated May 9, 1994. Comment date: September 30, 1996, in accordance with Standard Paragraph E at the end of this notice. 3. North American Energy Services Company [Docket No. EG96-94-000] On September 5, 1996, North American Energy Services Company, a Washington corporation, 999 Lake Drive, Suite 310, Issaquah, Washington 98027 (``Applicant''), filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations. Applicant states that it will be engaged in managing daily operations and maintenance of eligible facilities to be constructed in Argentina: the 77 MW Central Termica Patagonia power plant located near Comodoro Rivadavia, Argentina. Comment date: September 30, 1996, in accordance with Standard Paragraph E at the end of this notice. 4. Western Power Services, Inc., Wilson Power & Gas Smart, Inc., Jpower, Inc., Boyd Rosen and Associates, Inc., and SuperSystems, Inc. [Docket Nos. ER95-748-005, ER95-751-006, ER95-1421-004, ER95-1572-002, and ER96-906-001] Take notice that the following informational filings have been made with the Commission and are on file and available for public inspection and copying in the Commission's Public Reference Room: On July 30, 1996, Western Power Services, Inc. filed certain information as required by the Commission's May 16, 1995, order in Docket No. ER95-748-000. On August 26, 1996, Wilson Power & Gas Smart, Inc. filed certain information as required by the Commission's April 25, 1995, order in Docket No. ER95-751-000. On August 21, 1996, Jpower, Inc. filed certain information as required by the Commission's August 25, 1995, order in Docket No. ER95- 1421-000. On July 17, 1996, Boyd Rosen and Associates, Inc. filed certain information as required by the Commission's October 23, 1995, order in Docket No. ER95-1572-000. On August 23, 1996, SuperSystems, Inc. filed certain information as required by the Commission's March 27, 1996, order in Docket No. ER96- 906-000. 5. Florida Power Corporation [Docket No. ER96-2903-000] Take notice that on September 4, 1996, Florida Power Corporation (FPC), tendered for filing a contract for the provision of interchange service between itself and Calpine Power Services Company. The contract provides for service under Schedule J, Negotiated Interchange Service and OS, Opportunity Sales. FPC requests Commission waiver of the 60-day notice requirement in order to allow the contract to become effective as a rate schedule on September 5, 1996. Waiver is appropriate because this filing provides for rates under the Schedule OS that are lower than the rates for Schedule OS which have been previously accepted for filing. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 6. Louisville Gas and Electric Company [Docket No. ER96-2904-000] Take notice that on September 4, 1996, Louisville Gas and Electric Company, tendered for filing copies of service agreements between Louisville Gas and Electric Company and NorAm Energy Services, Engelhard Power Marketing, Koch Power Services, Inc., Electric Clearinghouse, Entergy Services, Inc., Enron Power Marketing, Inc., Rainbow Energy Marketing Corp., Morgan Stanley Capital Group, Inc., Municipal Electric Authority of Georgia, and Southeastern Power Administration (SEPA) under Rate GSS. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 7. Duke Power Company [Docket No. ER96-2905-000] Take notice that on September 4, 1996, Duke Power Company (Duke), tendered for filing a Transmission Service Agreement (TSA) between Duke, on its own behalf and acting as agent for its wholly-owned subsidiary, Nantahala Power and Light Company, and PanEnergy Power Services, Inc. (PanEnergy). Duke states that the TSA sets out the transmission arrangements under which Duke will provide PanEnergy non- firm point-to-point transmission service under its Pro Forma Open Access Transmission Tariff. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 8. Duke Power Company [Docket No. ER96-2906-000] Take notice that on September 4, 1996, Duke Power Company (Duke), tendered for filing a Transmission Service Agreement (TSA), between Duke, on its own behalf and acting as agent for its wholly-owned subsidiary, Nantahala Power and Light Company, and South Carolina Electric & Gas Company (SCE&G). Duke states that the TSA sets out the transmission arrangements under which Duke will provide SCE&G non-firm point-to-point transmission service under its Pro Forma Open Access Transmission Tariff. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 9. Cinergy Services, Inc. [Docket No. ER96-2907-000] Take notice that on September 4, 1996, Cinergy Services, Inc. (Cinergy), tendered for filing on behalf of its operating companies, The Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an Interchange Agreement, dated August 1, 1996 between Cinergy, CG&E, PSI and Williams Energy Services Company (WESCO). [[Page 48933]] The Interchange Agreement provides for the following services between Cinergy and WESCO. 1. Exhibit A--Power Sales by WESCO. 2. Exhibit B--Power Sales by Cinergy. Cinergy and WESCO have requested an effective date of September 9, 1996. Copies of the filing were served on Williams Energy Services Company, Oklahoma Corporation Commission, the Kentucky Public Service Commission, the Public Utilities Commission of Ohio and the Indiana Utility Regulatory Commission. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 10. Interstate Power Company [Docket No. ER96-2908-000] Take notice that on September 5, 1996, Interstate Power Company (IPW), tendered for filing a replacement Transmission Service Agreement between IPW and Illinois Power Company (IP). Under the Transmission Service Agreement, IPW will provide non-firm point-to-point transmission service to IP. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 11. Wisconsin Electric Power Company [Docket No. ER96-2909-000] Take notice that on September 5, 1996, Wisconsin Electric Power Company (Wisconsin Electric), tendered for filing an Electric Service Agreement and a Transmission Service Agreement between itself and IUC Power Services (IUC). The Electric Service Agreement provides for service under Wisconsin Electric's Coordination Sales Tariff. The Transmission Service Agreement allows IUC to receive transmission service under Wisconsin Electric's FERC Electric Tariff, Original Volume No. 7, under Docket No. OA96-196. Wisconsin Electric requests waiver of the Commission's notice requirements and an effective date of September 15, 1996 to allow for economic transactions. Copies of the filing have been served on IUC, the Public Service Commission of Wisconsin and the Michigan Public Service Commission. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 12. PECO Energy Company [Docket No. ER96-2910-000] Take notice that on September 5, 1996, PECO Energy Company (PECO), filed a Service Agreement dated August 30, 1996 with Rochester Gas and Electric Corporation (RG&E) under PECO's FERC Electric Tariff, First Revised Volume No. 4 (Tariff). The Service Agreement adds RG&E as a customer under the Tariff. PECO requests an effective date of August 30, 1996, for the Service Agreement. PECO states that copies of this filing have been applied to RG&E and to the Pennsylvania Public Utility Commission. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 13. Northeast Utilities Service Company [Docket No. ER96-2911-000] Take notice that on September 5, 1996, Northeast Utilities Service Company (NUSCO), tendered for filing, a Service Agreement to provide Long-Term Firm Point-to-Point Transmission Service to The Connecticut Light and Power Company, Western Massachusetts Electric Company, Holyoke Water Power Company, Holyoke Power and Electric Company and Public Service Company of New Hampshire (together, the NU System Companies) under the NU System Companies' Open Access Transmission Service Tariff No. 8. The Service Agreement provides for the delivery of a sale of Power from the NU System Companies to the Citizens Lehman Power Sales LP. NUSCO states that a copy of this filing has been mailed to the NU System Companies. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 14. American Electric Power Service Corporation [Docket No. ER96-2912-000] Take notice that on September 5, 1996, the American Electric Power Service Corporation (AEPSC), tendered for filing service agreements, executed by AEPSC and the following Parties, under the AEP Companies' Power Sales and/or Point-to-Point Transmission Service Tariffs: Carolina Power & Light Company, IUC Power Services, PacifiCorp Power Marketing, Inc., City of Shelby, Ohio, and Williams Energy Services Company. The Power Sales Tariff has been designated as FERC Electric Tariff, First Revised Volume No. 2, effective October 1, 1995. The Transmission Tariff has been designated as FERC Electric Tariff Original Volume No. 4, effective July 9, 1996. AEPSC requests waiver of notice to permit the Service Agreements to be made effective for service billed on and after August 7, 1996. A copy of the filing was served upon the Parties and the State Utility Regulatory Commissions of Indiana, Kentucky, Michigan, Ohio, Tennessee, Virginia and West Virginia. Comment date: September 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 15. Indianapolis Power & Light Company [Docket No. ES96-43-000] Take notice that on September 3, 1996, Indianapolis Power & Light Company filed an application, under Sec. 204 of the Federal Power Act, seeking authorization to issue unsecured promissory notes, from time to time, in an aggregate principal amount of up to $175 million outstanding at any one time on or before December 31, 1998, with final maturities not more than twelve (12) months after the date of issuance. Comment date: October 2, 1996, in accordance with Standard Paragraph E at the end of this notice. Standard Paragraph E. Any person desiring to be heard or to protest said filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or protests should be filed on or before the comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection. Lois D. Cashell, Secretary. [FR Doc. 96-23766 Filed 9-16-96; 8:45 am] BILLING CODE 6717-01-P
Document
LSP-Whitewater, L.P., et al.; Electric Rate and Corporate Regulation Filings
[Federal Register Volume 61, Number 181 (Tuesday, September 17, 1996)] [Notices] [Pages 48931-48933] From the Federal Register Online via the Government Publishing Office [ www....
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
61 FR 48931
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“LSP-Whitewater, L.P., et al.; Electric Rate and Corporate Regulation Filings,” thefederalregister.org (September 17, 1996), https://thefederalregister.org/documents/96-23766/lsp-whitewater-l-p-et-al-electric-rate-and-corporate-regulation-filings.