BPA/Lower Valley Transmission Project

This notice announces BPA's proposal to construct a new single-circuit 115-kilovolt transmission line from BPA's Swan Valley Substation, west of Swan Valley, Bonneville County, ...

[Federal Register Volume 61, Number 216 (Wednesday, November 6, 1996)]
[Notices]
[Pages 57400-57401]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-28503]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Bonneville Power Administration


BPA/Lower Valley Transmission Project

Agency

Bonneville Power Administration (BPA), Department of Energy (DOE).

Action

Notice of floodplain and wetlands involvement.

-----------------------------------------------------------------------

Summary

This notice announces BPA's proposal to construct a new single-circuit 115-kilovolt transmission line from BPA's Swan Valley Substation, west of Swan Valley, Bonneville County, Idaho, east approximately 36 miles to BPA's Teton Substation, northwest of Jackson, Teton County, Wyoming. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements (10 C.F.R. Part 1022), BPA will prepare a floodplain and wetlands assessment and will perform this proposed action in a manner so as to avoid or minimize potential harm to or within the affected floodplain and wetlands. The assessment and a floodplain statement of findings will be included in the environmental impact statement being prepared for the proposed project in accordance with the National Environmental Policy Act.

Dates

Comments are due to the address below no later than November 21, 1996.

Addresses

Submit comments to the Public Involvement and Information Manager, Bonneville Power Administration--CKP, P.O. Box 12999, Portland, Oregon, 97212. Comments may also be sent to the BPA Internet address: comment@bpa.gov.

For Further Information Contact

Nancy Wittpenn--ECN, Bonneville Power Administration, P.O. Box 3621, Portland, Oregon, 97208-3621, phone number (503) 230-3297, fax number (503) 230-5699.

Supplementary Information

As proposed, the project would locate a new 115-kV transmission lines on 75 feet of additional right-of-way. The proposed transmission line corridor and associated access roads cross drainages identified as 100 year floodplains. The Federal Emergency Management Agency (FEMA) identifies areas that have a one percent chance of being flooded in a given year as a 100-year floodplain. The 100-year floodplains crossed by the transmission line corridor and or access roads are:

Pine Creek T2N R43E Sec 14 (corridor)

T2N R44E Sec 6 (corridor & access road) T3N R44E Sec 31 (access road) T3N R44E Sec 29 (access road) T3N R44E Sec 28 (access road) Trail Creek T3N R46W Sec 30 (corridor) T41N R117W no sec (corridor) Fish Creek T41N R117W Sec 2 (corridor) Lake Creek T41N R117W Sec 2 (corridor & access road)

Adverse impacts due to the construction and maintenance activities of the proposed project could include potential flood damage to transmission facilities, increased flooding due to displacement of water from the normal floodplain, and increased potential for erosion of floodplain soil and sediment near the construction sites. These impacts may occur if transmission towers or access roads encroach on designated floodplains. No impacts would occur where floodplains are avoided, spanned, or accepted mitigation measures effectively eliminate or avoid impacts. The proposed project lies within two major drainages that support riparian wetlands. Pine Creek drains into the Snake River and Trail Creek drains into the Teton River. These wetlands are mapped on the USFWS National Wetlands Inventory. The wetlands associated with Fish Creek and Lake Creek developed from surface and irrigation run-off. Wet meadows are also present throughout the project area. Although wetlands occur throughout the proposed project area, no direct impacts would occur from construction of the new line. Wetlands would be spanned by the conductors and transmission towers would be located upland of the wetlands. Some indirect impacts may occur from vehicular disturbance and erosion. Stormwater runoff from roads and tower foundation areas could cause sedimentation in the wetlands. New road construction and improvements to existing access roads could cause impacts to riparian wetlands associated with Pine Creek and Trail Creek. The construction activities could carry sediment to adjacent wetlands and affect water quality and biological productivity. Ongoing vehicular disturbance could cause permanent adverse impacts to wetland functions and could degrade overall biological productivity. Although no road access exists for the section of the corridor between Fish Creek and Lake Creek, new roads would be constructed to avoid impacting wetlands. Ongoing maintenance activities have the potential to impact wetlands. Roads without adequate drainage may cause sedimentation to wetlands from stormwater runoff. Maps and further information are available from BPA at the address above.

Issued in Portland, Oregon, on October 30, 1996. Kenneth C. Kirkman, NEPA Compliance Officer. [FR Doc. 96-28503 Filed 11-5-96; 8:45 am] BILLING CODE 6450-01-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

61 FR 57400