[Federal Register Volume 61, Number 68 (Monday, April 8, 1996)] [Proposed Rules] [Pages 15427-15430] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-8599] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 RIN 3150-AF41 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors
Agency
Nuclear Regulatory Commission.
Action
Advance notice of proposed rulemaking.
-----------------------------------------------------------------------
Summary
The Nuclear Regulatory Commission is considering amending its regulations relating to financial assurance requirements for the decommissioning of nuclear power plants. Potential deregulation of the power generating industry has created uncertainty with respect to whether current NRC regulations concerning decommissioning funds and the financial mechanisms will require a modification to account for utility reorganizations not contemplated when current financial assurance requirements were promulgated. Additionally, the NRC is considering requiring power reactor licensees to periodically report on the status of their decommissioning funds. Allowing credit for earnings on decommissioning trust funds during extended storage will also be considered. This advance notice of proposed rulemaking is issued to invite public comment on issues pertaining to the form and content of the NRC's nuclear power reactor decommissioning financial assurance requirements as they relate to electric utility deregulation.
Dates
Submit comments by June 24, 1996. Comments received after this date will be considered if it is practical to do so, but the Commission is able to assure consideration only for comments received on or before this date.
Addresses
Mail comments to: The Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Docketing and Service Branch. Deliver comments to: 11555 Rockville Pike, Rockville, Maryland, between 7:45 a.m. and 4:15 p.m. Federal workdays. For information on submitting comments electronically, see the discussion under Electronic Access in the Supplementary Information Section. Examine copies of comments received at: The NRC Public Document Room, 2120 L Street NW. (Lower Level), Washington, DC.
For Further Information Contact
Brian J. Richter, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone (301) 415-6221, e-mail bjr@nrc.gov.
Supplementary Information
Background
Requirements pertaining to financial assurance for the decommissioning of nuclear power reactors are contained in Sec. 50.75. Under Sec. 50.75(e)(3), the NRC allows power reactor licensees, who are defined as ``electric utilities'' 1 under Sec. 50.2, to set aside funds annually over the estimated life of the reactor for decommissioning. The NRC provided more flexibility to its electric utility licensees than other licensees because electric utilities have existed in a highly structured environment regulated by State public utility commissions (PUCs) or the Federal Energy Regulatory Commission (FERC). Under Sec. 50.75(e)(2), the NRC requires licensees other than electric utilities to set aside an external sinking fund coupled with a surety method or insurance for any unfunded balance. However, with the advent of deregulation, the distinction between electric utility licensees and other licensees will likely be reduced or eliminated. Thus, the NRC needs to clarify the definition of ``electric utility'' and to require additional assurance of those licensees whose power reactor costs are no longer regulated.
\\ \1\ ``Electric utility means any entity that generates or distributes electricity and which recovers the cost of this electricity, either directly or indirectly, through rates established by the entity itself or by a separate regulatory authority. Investor-owned utilities, including generation or distribution subsidiaries, public utility districts, municipalities, rural electric cooperatives, and State and Federal agencies, including associations of any of the foregoing, are included within the meaning of ``electric utility.'' ---------------------------------------------------------------------------
Typically, power reactor licensees place decommissioning funds in external trust or escrow accounts that are reserved for decommissioning activities.2 Under the definition of external sinking fund, power reactor licensees must accumulate all the funds estimated to be needed for decommissioning by the time their facilities are permanently shut down. Although Sec. 50.75(e) also allows power reactor licensees to use surety bonds, letters of credit, and prepayment to provide funding assurance, virtually all power reactor licensees use the external sinking fund method of assurance.
\\ \2\ Many licensees that have established decommissioning trust funds for their power reactors are making deposits into their trust accounts both for decommissioning costs as defined under Sec. 50.2 and for other decommissioning-associated costs such as interim spent fuel management and storage and ``green field'' costs. The NRC allows licensees to deposit funds in the same trust account as long as the trust has sub-accounts that clearly delineate the purposes of the sub-account. A trust or sub-account established to provide assurance of NRC-defined decommissioning costs should be stipulated to cover NRC-defined decommissioning costs before any other purpose. ---------------------------------------------------------------------------
In addition, Sec. 50.75(e)(3)(iv) provides that an electric utility that is a Federal Government licensee need only provide assurance in the form of a statement of intent indicating that decommissioning funds will be obtained when necessary.
The intent of Sec. 50.75 is to provide reasonable assurance that funds for decommissioning will be available when necessary. The inability of the licensee to provide funding for decommissioning may adversely affect protection of public health and safety. Also, a lack of decommissioning funds is a financial risk to taxpayers (i.e., if the licensee cannot pay for decommissioning, taxpayers would ultimately pay the bill). In a related issue, when the Commission issued the decommissioning rule, the Commission believed that, for a regulated electric utility, an external reserve account collected over the estimated remaining reactor life would provide the necessary reasonable assurance. However, as a conservatism built into the rule, the NRC decided not to allow licensees to take credit for earnings on their trust funds while their reactors were in extended safe storage. Rather, the NRC assumed that during safe storage the rate of return on external decommissioning trust funds would equal the decommissioning cost escalation rate. Thus, the after-tax, after-inflation earnings rate effectively would be zero. When the NRC promulgated the 1988 decommissioning rule, it did not require licensees to report periodically on the status of their decommissioning funds. NRC viewed licensee compliance with the funding assurance requirements as a matter to be determined through the inspection process when necessary. Also, the NRC recognized in the 1988 decommissioning rule, the PUCs' and FERC's authority to set annual contribution rates to decommissioning funds and to establish investment and other management criteria for the funds. The PUCs and FERC also actively monitor these decommissioning funds as part of their rate regulatory responsibility. Moreover, the Financial Accounting Standards Board (FASB), a national organization that sets accounting standards, recently initiated a review of reporting of decommissioning obligations on electric utility financial statements. Although FASB has not established a final standard, it appears that it will increase the level of detail on power reactor licensees' financial statements. If adopted, this standard would likely give the NRC and others additional information on the status of decommissioning funds. However, the advent of deregulation, and consequently less oversight by FERC or by PUCs, makes it imperative that the NRC have a source of information to monitor the status of decommissioning funds.
Specific Proposal
The Commission is considering amending Secs. 50.2, 50.75, and 50.82 to require that electric utility reactor licensees provide assurance that the full estimated cost of decommissioning will be available through an acceptable guarantee mechanism if the licensees are no longer subject to rate regulation by PUCs or FERC, and do not have a guaranteed source of income. The amendment would also allow licensees to assume a positive real rate of return on decommissioning funds during the safe storage period. Lastly, a periodic reporting requirement would be established.
Specific Considerations
Advice and recommendations on a proposed rule reflecting the foregoing and any other points considered pertinent are invited from all interested persons. Comments and supporting reasons are particularly requested on the following questions arranged by topic:
A. Timing and Extent of Electric Utility Industry Deregulation
A.1. What is the likely timetable for industry restructuring and deregulation? A.2. Will the electric utility industry go through several phases as it responds to deregulation and other competitive pressures? If so, what will be the likely major changes in business structure that may occur in each phase? Will rates remain regulated at the retail distribution level, with deregulation occurring for generation and transmission? Will retail wheeling become widespread and lead to deregulation of all sectors of the electric utility industry? Or will rates remain regulated at the retail distribution level, with deregulation occurring within the generation and transmission sectors? What will likely be the final structure of the electric utility industry, assuming either partial or full deregulation? A.3. Some States appear to oppose deregulation. Will they be able to maintain their opposition if neighboring States deregulate? What will be the industry structure if some States deregulate more than others? Can a ``hybrid'' system exist effectively?
B. Stranded Costs.
B.1. How will restructuring affect large baseload plants that currently receive rate relief to cover construction costs or have a portion yet to be phased into the rate base? Specifically, what is the probability that and degree to which these costs will be recoverable should a nuclear power plant be deemed to be non-competitive because of high construction costs? What will be the source of operating, maintenance, and capital improvement funds should such a nuclear generator decide to continue operations? What will be the source of funds to prematurely and safely shut down an uneconomic plant? Are transmission access or other surcharges to cover stranded costs likely?
C. Nuclear Financial Qualifications and Decommissioning Funding Assurance
C.1. If nuclear plants are shut down prematurely, how will licensees who can no longer pass costs through to ratepayers provide for a shortfall of decommissioning funds? C.2. At what point does an operator of a nuclear power plant cease to be a ``utility'' as defined in Sec. 50.2 of the NRC's regulations? C.3. If an electric utility reorganizes itself, including divesting parts of itself, so that the remaining entity operating a reactor is no longer regulated by a rate-setting State or Federal body, or will cease to be regulated by a rate-setting State or Federal body if the reactor ceases operation, would it be appropriate to require financial assurance for the decommissioning costs in full prior to NRC approval of such reorganizations? Such assurance could take the form of self- guarantee, parent company guarantee, certification by the rate- regulating entity, or other financial surety mechanism to cover the unfunded decommissioning costs. Should the NRC require additional assurance for adequate funds for safe operation and decommissioning in anticipation of deregulation? Should the NRC require, as a condition of approval of certain reorganizations involving the transfer of control of a nuclear power plant, that newly created organizations or holding companies sign a binding agreement that holds them jointly liable for decommissioning costs associated with that nuclear power plant? What would be the impact of such actions? C.4. Should the NRC require a licensee to provide a reasonable assurance of the availability of funds for decommissioning by imposing a minimum level of net worth, cash flow, or other financial measure (similar to 10 CFR Part 30, Appendices A and B)? If below the minimum levels, the licensee would no longer be allowed to accumulate decommissioning costs over remaining facility life, but would need a guarantee that funds would be available for decommissioning through various financial measures. What financial measures would be effective and reasonable? C.5. Would PUCs and FERC be willing to certify that licensees under their jurisdictions, both electric utility and
Part 50 licensees other than electric utilities, would be allowed to collect sufficient revenues through rates to complete decommissioning funding? C.6. What would be the impact if the NRC required licensees to accelerate collection of decommissioning funds such that decommissioning funding for all plants would be complete within 10 years (or some other time period)? C.7. Assume that licensees have accumulated funds that are determined to be adequate based on current estimates of decommissioning costs. If these estimates turn out to be low far in the future (for example, if final dismantlement occurs after a 50-year safe storage period), how will underfunding be remedied? What measures should the NRC consider for obtaining assurance of funds for such situations? Should the NRC require larger contingency factors in estimates to cover such situations? C.8. Would it be feasible for the nuclear industry to develop a captive insurance pool to pay for decommissioning funding shortfalls that result from premature decommissioning? Could such a pool be structured similarly to Nuclear Mutual Limited (NML) and Nuclear Electric Insurance Limited (NEIL), who currently insure on-site property damage and replacement power of member utilities? C.9. If PUC or FERC oversight is either substantially limited or eliminated, are there any other options for financial assurance of decommissioning that the NRC should consider?
D. Decommissioning Funding Assurance and a Federal Government Licensee
D.1. Section 50.75(e)(3)(iv) provides that an electric utility which is a Federal Government licensee need only provide assurance in the form of a statement of intent indicating that decommissioning funds will be obtained when necessary. Since a Federal utility licensee will likely be confronted with many of the same new competitive pressures as non-Federal utilities, the question arises, should the regulations continue to permit the provision of a statement of intent as the method by which these licensees provide financial assurance for decommissioning. There is, for example, no Federal law which clearly provides that the Federal Government would pay the Tennessee Valley Authority's financial decommissioning obligations should TVA be unable to do so. Does this fact or any other factors militate for or against allowing Federal utility licensees to continue to use statements of intent as the method by which financial assurance for decommissioning is provided?
E. Status of Decommissioning Trust Funds During Safe Storage Period
E.1. What real rate(s) of return should the NRC allow licensees to use as credit for earnings on the decommissioning trust funds during the extended safe storage period? E.2. What time period(s) should the NRC allow licensees to use in estimating the credit for earnings on the decommissioning trust funds during the extended safe storage period?
F. Reporting on the Status of Decommissioning Funds
F.1. What information should the NRC require to be included in the periodic reporting requirements? F.2. How often should the NRC require licensees to report on the status of decommissioning funding? The preliminary views expressed in this notice may change in light of comments received. In any case, there will be another opportunity for additional public comment in connection with any proposed rule that may be developed by the Commission.
Electronic Access
Comments may be submitted electronically, in either ASCII text or WordPerfect format (version 5.1 or later), by calling the NRC Electronic Bulletin Board (BBS) on FedWorld. The bulletin board may be accessed using a personal computer, a modem, and one of the commonly available communications software packages, or directly via Internet. Background documents on the advance notice of proposed rulemaking are also available, as practical, for downloading and viewing on the bulletin board. If using a personal computer and modem, the NRC rulemaking subsystem on FedWorld can be accessed directly by dialing the toll free number 1-(800) 303-9672. Communication software parameters should be set as follows: parity to none, data bits to 8, and stop bits to 1 (N,8,1). Using ANSI or VT-100 terminal emulation, the NRC rulemaking subsystem can then be accessed by selecting the ``Rules Menu'' option from the ``NRC Main Menu.'' Users will find the ``FedWorld Online User's Guides'' particularly helpful. Many NRC subsystems and data bases also have a ``Help/Information Center'' option that is tailored to the particular subsystem. The NRC subsystem on FedWorld can also be accessed by a direct dial phone number for the main FedWorld BBS, (703) 321-3339, or by using Telnet via Internet: fedworld.gov. If using (703) 321-3339 to contact FedWorld, the NRC subsystem will be accessed from the main FedWorld menu by selecting the ``Regulatory, Government Administration and State Systems,'' then selecting ``Regulatory Information Mall.'' At that point, a menu will be displayed that has an option ``U.S. Nuclear Regulatory Commission'' that will take you to the NRC Online main menu. The NRC Online area also can be accessed directly by typing ``/go nrc'' at a FedWorld command line. If you access NRC from FedWorld's main menu, you may return to FedWorld by selecting the ``Return to FedWorld'' option from the NRC Online Main Menu. However, if you access NRC at FedWorld by using NRC's toll-free number, you will have full access to all NRC systems, but you will not have access to the main FedWorld system. If you contact FedWorld using Telnet, you will see the NRC area and menus, including the Rules Menu. Although you will be able to download documents and leave messages, you will not be able to write comments or upload files (comments). If you contact FedWorld using FTP, all files can be accessed and downloaded but uploads are not allowed; all you will see is a list of files without descriptions (normal Gopher look). An index file listing all files within a subdirectory, with descriptions, is available. There is a 15-minute time limit for FTP access. Although FedWorld also can be accessed through the World Wide Web, like FTP that mode only provides access for downloading files and does not display the NRC Rules Menu. For more information on NRC bulletin boards call Mr. Arthur Davis, Systems Integration and Development Branch, NRC, Washington, DC 20555, telephone (301) 415-5780; e-mail AXD3@nrc.gov.
PART 50--DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
The authority citation for Part 50 continues to read as follows:
Authority: Secs. 102, 103, 104, 105, 161, 182, 183, 186, 189, 68 Stat. 936, 937, 938, 948, 953, 954, 955, 956, as amended, sec. 234, 83 Stat. 1244, as amended (42 U.S.C. 2132, 2133, 2134, 2135, 2201, 2232, 2233, 2236, 2239, 2282); secs. 201, as amended, 202, 206, 88 Stat. 1242, as amended, 1244, 1246 (42 U.S.C. 5841, 5842, 5846). Section 50.7 also issued under Pub. L. 95-601, sec. 10, 92 Stat. 2951 as amended by Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 U.S.C. 5851). Section 50.10 also issued under secs. 101, 185, 68 Stat. 936, 955, as amended (42 U.S.C. 2131, 2235); sec. 102, Pub. L. 91-190, 83 Stat. 853 (42 U.S.C. 4332). Sections
50.13, 50.54(dd), and 50.103 also issued under sec. 108, 68 Stat. 939, as amended (42 U.S.C. 2138). Sections 50.23, 50.35, 50.55, and 50.56 also issued under sec. 185, 68 Stat. 955 (42 U.S.C. 2235). Sections 50.33a, 50.55a and Appendix Q also issued under sec. 102, Pub. L. 91-190, 83 Stat. 853 (42 U.S.C. 4332). Sections 50.34 and 50.54 also issued under sec. 204, 88 Stat. 1245 (42 U.S.C. 5844). Sections 50.58, 50.91, and 50.92 also issued under Pub. L. 97-415, 96 Stat. 2073 (42 U.S.C. 2239). Section 50.78 also issued under sec. 122, 68 Stat. 939 (42 U.S.C. 2152). Sections 50.80 and 50.81 also issued under sec. 184, 68 Stat. 954, as amended (42 U.S.C. 2234). Appendix F also issued under sec. 187, 68 Stat. 955 (42 U.S.C. 2237).
Dated at Rockville, Maryland, this 1st day of April, 1996.
For the Nuclear Regulatory Commission. John C. Hoyle, Secretary of the Commission. [FR Doc. 96-8599 Filed 4-5-96; 8:45 am] BILLING CODE 7590-01-P