[Federal Register Volume 64, Number 16 (Tuesday, January 26, 1999)] [Notices] [Page 3935] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-1673] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-146-000] ANR Pipeline Company; Notice of Request Under Blanket Authorization January 20, 1999. Take notice that on January 11, 1999, ANR Pipeline Company (ANR), 500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP99-146-000 a request pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 157.211) for authorization to construct and operate under the provisions of Section 7(c) of the Natural Gas Act (NGA) an interconnection between ANR and Brownsville Power I, LLC (Brownsville), all as more fully set forth in the request that is on file with the Commission and open to public inspection. ANR's proposed interconnection will be located at its 30-inch main line and 30-inch loop line in Haywood County, Tennessee and will allow deliveries of natural gas to Brownsville's proposed power plant in Haywood County, Tennessee. ANR's proposed interconnection will consist of two 12-inch hot taps, one each on ANR's 30-inch main line and 30- inch loop line; one 10-inch ultrasonic meter assembly and one 4-inch turbine meter assembly; an electronic measurement system; one air- conditioned 10 foot by 10 foot building suitable for flow computer equipment; instrumentation to monitor flow or pressure; and approximately 1,000 feet of 12-inch piping. The maximum daily volume of the proposed interconnection will be 83.0 Mmcf/d. The total cost of ANR's facilities will be approximately $740,000, which will be fully reimbursed by Brownsville. ANR states that the construction of the proposed interconnection facilities will have no effect on its peak day and annual deliveries, that its existing tariff does not prohibit additional interconnections, that deliveries will be accomplished without detriment or disadvantage to its other customers and that the total volumes delivered will not exceed total volumes authorized prior to this request. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Secretary. [FR Doc. 99-1673 Filed 1-25-99; 8:45 am] BILLING CODE 6717-01-M
Document
ANR Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 64, Number 16 (Tuesday, January 26, 1999)] [Notices] [Page 3935] From the Federal Register Online via the Government Publishing Office [ www.gpo.gov ] [...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
64 FR 3935
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“ANR Pipeline Company; Notice of Request Under Blanket Authorization,” thefederalregister.org (January 26, 1999), https://thefederalregister.org/documents/99-1673/anr-pipeline-company-notice-of-request-under-blanket-authorization.