Document

Drawbridge Operation Regulations: Connecticut River, CT

The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations governing the operation of the CONRAIL Middletown-Portland ...

[Federal Register Volume 64, Number 159 (Wednesday, August 18, 1999)]
[Rules and Regulations]
[Page 44826]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-21376]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD01-99-140]


Drawbridge Operation Regulations: Connecticut River, CT

Agency

Coast Guard, DOT.

Action

Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

Summary

The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations governing the operation of the CONRAIL Middletown-Portland Bridge, mile 32.0, across the Connecticut River between Middletown and Portland, Connecticut. This deviation from the regulations allows the bridge owner to keep the bridge in the closed position from August 5, 1999, through September 13, 1999, Thursday through Monday, 6 a.m. to 4:30 p.m. This action is necessary to facilitate repairs to replace structural steel on the bridge.

Dates

This deviation is effective from August 5, 1999, through September 13, 1999.

For Further Information Contact

Mr. Joseph Schmied, Project Officer, First Coast Guard District, at (212) 668-7165.

Supplementary Information

The CONRAIL Middletown-Portland Bridge, mile 32.0, across the Connecticut River has vertical clearances of 25 feet at mean high water, and 27 feet at mean low water in the closed position. The operation regulations are in 33 CFR 117.205(b). The bridge owner, Connecticut Department of Transportation (CONNDOT), requested a temporary deviation from the operating regulations for the CONRAIL Middletown-Portland Bridge in order to conduct necessary repairs to the structural steel on the bridge. During the process of this work the bridge cannot be opened. Vessels that can pass under the bridge without an opening may do so at all times during the closed period. This work is essential for public safety and the continued operation of the bridge. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. This deviation to the operating regulations authorizes CONNDOT to keep the CONRAIL Middletown-Portland Bridge, mile 32.0, across the Connecticut River between Middletown and Portland, Connecticut, in the closed position for repairs from August 5, 1999, through September 13, 1999, Thursday through Monday, 6 a.m. to 4:30 p.m. This deviation from the operating regulations is authorized under 33 CFR 117.35.

Dated: August 9, 1999. R.M. Larrabee, Rear Admiral, U.S. Coast Guard Commander, First Coast Guard District. [FR Doc. 99-21376 Filed 8-17-99; 8:45 am] BILLING CODE 4910-15-M

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

64 FR 44826

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Drawbridge Operation Regulations: Connecticut River, CT,” thefederalregister.org (August 18, 1999), https://thefederalregister.org/documents/99-21376/drawbridge-operation-regulations-connecticut-river-ct.