[Federal Register Volume 64, Number 208 (Thursday, October 28, 1999)] [Notices] [Pages 58056-58057] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-28195] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests October 22, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: P-11811-000. c. Date Filed: September 1, 1999. d. Applicant: Wisconsin Logs, Inc. e. Name of Project: Merrill Paper Mill. f. Location: On the Prairie River, in the town of Merrill and the city of Merrill, Lincoln County, Wisconsin. The project would not utilize federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C., Secs. 791(a)- 825(r). h. Applicant Contact: Mr. Michael A. Swiger, Van Ness Feldman, P.C., 1050 Thomas Jefferson Street, NW, Seventh Floor, Washington, DC 20007, (202) 298-1891. i. FERC Contact: William H. Diehl, E-mail address, William.Diehl@ferc.fed.us, or telephone (202) 219-2813. j. Deadline Date: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. The existing, inoperative project would consist of: (1) An 18- foot-high dam having a 78-foot-long gated spilway, five 11-foot-wide, 9-foot-high timber taintor gates, a 550-foot-long main earthen embankment, and a 400-foot-long secondary embankment; (2) a reservoir, known as Ward Mill Pond or Prairie Lake, having a 118-acre surface area and a 709-acre-foot storage capacity; (3) a forty-foot-long flume; (4) an intake pipe; (5) a powerhouse containing a 187-kW generating unit; and (6) appurtenant facilities. The facilities are owned by International Paper Company, 3 Paragon Drive, Montvale, New Jersey 07645. Applicant will finance all efforts required to conduct studies and to prepare and file a license application. Project energy would be used in the lumber mill. l. A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Washington, DC 20426, or by calling (202) 208-1371. This filing may be viewed on the web at www.ferc.fed.us/online/ rims.htm (call (202) 208-2222 for assistance). A copy is also available for inspection and reproduction at the address in item h above. Preliminary Permit--Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. Notice of intent--A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. Proposed Scope of Studies under Permit--A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. Comments, Protests, or Motions to Intervene--Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Filing and Service of Responsive Documents--Any filings must bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project Number of the particular application to which the filing refers. Any of the above- named documents [[Page 58057]] must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An additional copy must be sent to Director, Division of Project Review, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Agency Comments--Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. David P. Boergers, Secretary. [FR Doc. 99-28195 Filed 10-27-99; 8:45 am] BILLING CODE 6717-01-M
Document
Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
[Federal Register Volume 64, Number 208 (Thursday, October 28, 1999)] [Notices] [Pages 58056-58057] From the Federal Register Online via the Government Publishing Office [ www.g...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
64 FR 58056
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests,” thefederalregister.org (October 28, 1999), https://thefederalregister.org/documents/99-28195/notice-of-application-accepted-for-filing-and-soliciting-motions-to-intervene-and-protests.