[Federal Register Volume 64, Number 209 (Friday, October 29, 1999)] [Notices] [Pages 58395-58396] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-28333] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing And Soliciting Motions To Intervene And Protests October 25, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: P-11824-000. c. Date filed: September 27, 1999. d. Applicant: Universal Electric Power Corporation. e. Name of Project: Delta Dam Hydroelectric Project. f. Location: At the existing Delta Dam located on the Mohawk River, near the Town of Rome, Oneida County, New York. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Gregory S. Feltenberger, Universal Electric Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 535-7115. i. FERC Contact: Monte TerHaar (202) 219-2768 or E-mail address at monte.terhaar@FERC.fed.us. j. Deadline for filing motions to intervene and protest: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. Description of Project: The proposed project would utilize the existing Delta Dam with lands owned by the NYSCC, and would consist of the following facilities: (1) three new rectangular steel penstocks, each about 200-foot-long and 96 inches in diameter; (2) a new 90-foot- by 30- foot powerhouse to be constructed on the downstream side of the dam; (3) 3 turbine/generator units having a total installed capacity of 3.4 megawatts; (4) a new 1,000-foot-long, 14.7-kilovolt transmission line; and (4) appurtenant facilities. The proposed average annual generation is estimated to be 20 gigawatthours per year. The cost of the studies under the permit will not exceed $1,200,000. m. Available Locations of Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First Street, NE, Room 2-A, Washington, DC 20426, or by calling (202) 219-1371. A copy is also available for inspection and reproduction at Universal Electric Power Corp., Mr. Gregory S. Feltenberger, 1145 Highbrook Street, Akron, Ohio 44301, (330) 535-7115. A copy of the application may also be reviewed or printed by accessing the Commission's website on the Internet at [[Page 58396]] www.ferc.fed.us/online/rims.htm or call (202) 208-2222 for assistance. n. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. Preliminary Permit--Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. Notice of intent--A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. Proposed Scope of Studies under Permit--A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. Comments, Protests, or Motions to Intervene--Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests or motions to intervene must be received on or before the specified comment date for the particular application. Filing and Service of Responsive Documents--Any filings must bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project Number of the particular application to which the filing refers. Any of the above- named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 20426. An additional copy must be sent to Director, Division of Project Review, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing, application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Agency Comments--Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. David P. Boergers, Secretary. [FR Doc. 99-28333 Filed 10-28-99; 8:45 am] BILLING CODE 6717-01-M
Document
Notice of Application Accepted for Filing And Soliciting Motions To Intervene And Protests
[Federal Register Volume 64, Number 209 (Friday, October 29, 1999)] [Notices] [Pages 58395-58396] From the Federal Register Online via the Government Publishing Office [ www.gpo...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
64 FR 58395
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Notice of Application Accepted for Filing And Soliciting Motions To Intervene And Protests,” thefederalregister.org (October 29, 1999), https://thefederalregister.org/documents/99-28333/notice-of-application-accepted-for-filing-and-soliciting-motions-to-intervene-and-protests.