[Federal Register Volume 64, Number 64 (Monday, April 5, 1999)] [Notices] [Pages 16442-16443] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-8270] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Scoping Meetings and Site Visit and Soliciting Scoping Comments March 31, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: New Major License. b. Project No.: 2110-003. c. Date Filed: June 26, 1998. d. Applicant: Consolidated Water Power Company. e. Name of Project: Stevens Point Hydroelectric Project. f. Location: On the Wisconsin River, at river mile 236, in the town of Stevens Point, Portage County, Wisconsin. There are three parcels of federal lands, partially inundated islands totaling about 15.6 acres, within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Mark Anderson, Consolidated Water Power Company, P.O. Box 8050, Wisconsin Rapids, WI 54495-8050, (715) 422-3927. i. FERC Contact: Any questions on this notice should be addressed to Michael Spencer, E-mail address, michael.spencer@ferc.fed.us, or telephone (202) 219-2846. j. Deadline for filing scoping comments: May 13, 1999. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Status of environmental analysis: This application is not ready for environmental analysis at this time. l. Description of the Project: The project consists of the following existing facilities: (1) a 28-foot-high main dam comprised of 1,889 feet of concrete gravity walls in four sections, a spillway section containing 15 Taintor gates, and a total of 4,090 feet of earth dikes, on both the east and west banks of the river; (2) an auxiliary 2,000-foot-long concrete uncontrolled overflow spillway (Rocky Run) and associated 5,000 feet of earth dikes, located about 1.25 miles upstream of the main dam; (3) a 12-mile-long, 3,915-acre impoundment at the normal maximum water surface elevation of 1,087.4 feet msl, and a maximum storage capacity of 27,000 acre-feet; (4) a powerhouse integral with the dam containing six vertical Francis turbine units for a total installed capacity of 3,840 kW and an annual energy generation of 28.4 GWh; (5) switchgear consisting of a single power transformer for the six units; and (6) appurtenant facilities. m. Locations of the application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 208-1371. This filing may be viewed on the web at www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for assistance). A copy is also available for inspection and reproduction at the address shown in item h. n. Scoping Process: The Commission intends to prepare a multiple project Environmental Assessment (EA) for the proposed relicensing of the Stevens Point Project, Biron Project (FERC No. 2192), and Rhinelander Project (FERC No. 2161), in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed actions. Scoping Meetings The Commission will hold joint scoping meetings for the Stevens Point and Biron Projects, one in the daytime and one in the evening, to help us identify the scope of issues to be addressed in the EA. The daytime scoping meeting will focus on resource agency concerns, while the evening scoping meeting is primarily for public input. All interested individuals, organizations, and agencies are invited to attend one or both of the meetings, and to assist the staff in identifying the scope of the environmental issues that should be analyzed in the EA. The times and locations of these meetings are as follows: Daytime Meeting Wednesday, April 14, 1999, 1 p.m., Board Room, Plover Municipal Building, 2400 Post Road, Business Highway 51, Plover, Wisconsin. Evening Meeting Wednesday, April 14, 1999, 7 p.m., Stevens Point Holiday Inn, 1501 Northpoint Drive, Stevens Point, Wisconsin. To help focus discussions, we will distribute a Scoping Document (SD1) outlining the subject areas to be addressed in the EA to parties on the Commission's mailing list. Copies of the SD1 also will be available at the scoping meetings. Site Visit The applicant and Commission staff will conduct a project site visit on Wednesday, April 14, 1999. We will meet at the parking lot near the boat launch in Bukolt Park, off Bukolt Avenue, Stevens Point, at 9 a.m. If you would like to attend, please call Mark Anderson, Consolidated Water Power Company, at (715) 422-3927, no later than April 9, 1999. Objectives At the scoping meetings, the staff will: (1) Summarize the environmental issues tentatively identified for analysis in the EA; (2) solicit from the meeting participants all available information, especially quantifiable data, on the [[Page 16443]] resources at issue; (3) encourage statements from experts and the public on issues that should be analyzed in the EA, including viewpoints in opposition to, or in support of, the staff's preliminary views; (4) determine the resource issues to be addressed in the EA; and (5) identify those issues that require a detailed analysis, as well as those issues that do not require a detailed analysis. The meetings will be recorded by a stenographer and will become part of the formal record of the Commission's proceeding on the project. Individuals presenting statements at the meetings will be asked to sign in before the meeting starts and to identify themselves clearly for the record. Individuals, organizations and agencies with environmental expertise and concerns are encouraged to attend the meetings and to assist the staff in defining and clarifying the issues to be addressed in the EA. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-8270 Filed 4-2-99; 8:45 am] BILLING CODE 6717-01-M
Document
Notice of Scoping Meetings and Site Visit and Soliciting Scoping Comments
[Federal Register Volume 64, Number 64 (Monday, April 5, 1999)] [Notices] [Pages 16442-16443] From the Federal Register Online via the Government Publishing Office [ www.gpo.gov...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
64 FR 16442
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Notice of Scoping Meetings and Site Visit and Soliciting Scoping Comments,” thefederalregister.org (April 5, 1999), https://thefederalregister.org/documents/99-8270/notice-of-scoping-meetings-and-site-visit-and-soliciting-scoping-comments.