[Federal Register Volume 64, Number 70 (Tuesday, April 13, 1999)] [Notices] [Pages 18044-18046] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-9151] ----------------------------------------------------------------------- DEPARTMENT OF THE INTERIOR Bureau of Land Management [CO-034-99-5440-00-CO23; COC61945, COC61357, COC61209] DEPARTMENT OF AGRICULTURE Forest Service Notice of Intent AGENCY: Bureau of Land Management, Interior; Forest Service, Agriculture. Responsible Officials: Ann Morgan, State Director, Colorado State Office, Bureau of Land Management, 2850 Youngfield, Denver, CO 80215. Robert L. Storch, Forest Supervisor, Grand Mesa, Uncompahgre and Gunnison National Forests, U.S. Forest Service, 2250 US Hwy 50, Delta, CO 81416. ACTION: Notice of Intent and Notice of Scoping to prepare an Environmental Impact Statement (EIS) on lease and exploration license applications for Federal coal in Delta and Gunnison Counties, Colorado. ----------------------------------------------------------------------- SUMMARY: The Bureau of Land Management (BLM) and the Forest Service (FS) will direct preparation of a third-party Environmental Impact Statement (EIS) to document the analysis and disclose the environmental effects of proposed actions to offer the Iron Point and Elk Creek Coal Lease Tracts for competitive bidding and the Iron Point Coal Exploration license for exploration drilling in accordance with 43 CFR parts 3425 and part 3410. The BLM will be the lead agency for preparation of the EIS and the FS will be a joint lead agency. The Office of Surface Mining Reclamation and Enforcement (OSM) will participate as a cooperating agency. The original application for coal lease was filed in August 1997 by Bowie Resources Limited (Bowie) requesting the BLM to offer for competitive lease for approximately 3,403.27 acres of federal coal in Delta County, Colorado. It was designated the Iron Point Tract. In December 1997, the BLM received a competitive lease application from Oxbow Mining, Inc. (Oxbow), requesting for competitive lease approximately 3,702.81 acres of federal coal in Delta and Gunnison Counties, Colorado. The Tract delineation by the Uncompahgre Field Office resulted in the addition of 160 acres of federal coal for a total of 3,862.81 acres. This tract was designated the Elk Creek Tract. In addition, Bowie Resources, LTD submitted an application for a coal exploration license on unleased lands adjacent to the above coal lease application areas. The exploration lands contain approximately 6,053.00 acres. Lands affected by these applications are managed by both the BLM and Forest Service. Separate Environmental Assessments (EA) were completed on the two lease applications, but not on the exploration license. As part of the NEPA public process, the BLM and USFS subsequently determined that the requirements of NEPA would be best served by preparing a single EIS for these coal applications. DATES: The public has the opportunity to submit written comments on concerns or issues that the Agencies should address in processing these coal applications. The Agencies will accept written comments on the scope of analyses for the application areas at the address given below. Comments should be submitted by May 17, 1999, in order to be considered in the draft EIS. A public scoping meeting will be held April 21, 1999 at the Hotchkiss High School, 3535J 60 Lane, Hotchkiss, CO at 7:00 pm. At this time, it is estimated that a Draft EIS will be available in mid August 1999 and a Final EIS will be available in mid December 1999. ADDRESSES: Please address questions, comments, or concerns on the EIS to the Bureau of Land Management, Attn: Jerry Jones, 2465 South Townsend Ave., Montrose, CO, 81401, or fax them to 970-240-5368. FOR FURTHER INFORMATION CONTACT: Jerry Jones at the above address, or phone: 970-240-5338. SUPPLEMENTARY INFORMATION: In August of 1997, Bowie filed coal lease application COC61209 (Iron Point Tract) [[Page 18045]] requesting BLM offer federal coal for competitive lease. This application was later amended to reduce the acreage, but the original application was for the following lands: T. 12 S., R. 91 W., 6th P.M. Sec. 33, lots 1 to 16, inclusive, S\1/2\N\1/2\; Sec. 34, lots 1 to 16, inclusive, S\1/2\N\1/2\. T. 13 S., R. 91 W., 6th P.M. Sec. 2, SW\1/4\NW\1/4\, NW\1/4\SW\1/4\, and E\1/2\SW\1/4\; Sec. 3, lots 1 to 4, inclusive, S\1/2\N\1/2\, and N\1/2\S\1/2\; Sec. 4, lots 1 to 4, inclusive, S\1/2\N\1/2\, and S\1/2\; Sec. 5, S\1/2\SE\1/4\, and SE\1/4\SW\1/4\; Sec. 8, NE\1/4\; Sec. 9, NW\1/4\, and N\1/2\SW\1/4\; Sec. 11, NE\1/4\NW\1/4\. containing 3,403.27 +/-acres, with an estimated 26.3 million tons of recoverable coal. The coal resource within the Iron Point tract is limited to coal recoverable by underground mining methods. In December of 1997, Oxbow filed coal lease application COC61357, (Elk Creek Tract), requesting the BLM offer for competitive lease federal coal in the lands described as: T. 12 S., R. 90 W., 6th P.M. Sec. 31, lots 1 to 14, inclusive, and NE\1/4\; Sec. 32, lots 3 to 6, inclusive, lots 11 to 14, inclusive, and NW\1/4\. T. 12 S., R. 91 W., 6th P.M. Sec. 35, lots 1, 2, and 4 to 8, inclusive, 13 to 16, inclusive, lots 21, 22, and that part of HES No. 134 lying in the NE\1/4\; Sec. 36, lots 1 to 17, inclusive, NE\1/4\, E\1/2\NW\1/4\, SW\1/ 4\NW\1/4\, and that part of HES No.134 lying in lot 1. T. 13 S., R. 90 W., 6th P.M. Sec. 5, lots 7 to 10, inclusive; Sec. 6, lots 8 to 17, inclusive. T. 13 S., R. 91 W., 6th P.M. Sec. 1, lots 1 to 4, inclusive, S\1/2\NW\1/4\ and SW\1/4\; Sec. 2, lot 1, and S\1/2\NE\1/4\; Sec. 12, S\1/2\NE\1/4\, and NW\1/4\. containing 3,862.81+/-acres with approximately 21 million tons of recoverable coal. The coal resource to be offered for lease is limited to coal recoverable by underground mining methods. In May of 1998, Bowie filed a coal exploration license application, (COC61945), with the BLM. The Iron Point Exploration License contains unleased coal deposits owned by the United States of America in the following described lands in Delta County, Colorado. T. 12 S., R. 91 W., 6th P.M. Sec. 14, lots 7,8, S\1/2\S\1/2\, NE\1/4\SW\1/4\, NW\1/4\SE\1/4\; Sec. 22, S\1/2\; Sec. 23, lots 1 to 7, inclusive, W\1/2\, and that part of HES No. 133 lying in the S\1/2\SE\1/4\; Sec. 26, lots 1 to 5, inclusive, W\1/2\, N\1/2\SE\1/4\, and that part of HES No. 133 lying in the NE\1/4\; Sec. 27, all; Sec. 28, S\1/2\; Sec. 29, SE\1/4\; Sec. 32, lots 1, 2, 7 to 10, inclusive, lots 15, 16, and NE\1/ 4\; Sec. 33, lots 1 to 16, inclusive, and N\1/2\; Sec. 34, lots 1 to 16, inclusive, and N\1/2\; Sec. 35, lots 3, and 7 to 22, inclusive, NE\1/4\NW\1/4\, W\1/ 2\NW\1/4\, that part of HES No. 134 and that part of lots 4 to 6, inclusive, lying in the S\1/2\S\1/2\NE\1/4\. The area described contains approximately 6,053.00 +/-acres. These applications encompass federal coal on BLM and Gunnison National Forest lands. Additions and/or deletions to the delineated tracts may be considered as alternatives to the proposed action. Alternatives will be developed and analyzed based on issues and management needs. Bowie and Oxbow applied to the BLM for the Iron Point and Elk Creek coal lease tracts respectfully to extend the production life of their existing underground mines. Similarly, Bowie applied to the BLM for an exploration license to further delineate to coal resource in lands adjacent to their ongoing mining. The requested Iron Point tract and the exploration license area are adjacent to the presently approved permit area for the Bowie No. 2 Mine which is operated by Bowie. Likewise, the requested Elk Creek tract is adjacent to the presently approved permit area for the Sanborn Creek Mine which is operated by Oxbow. If the Iron Point and Elk Creek tracts are leased, the coal would be mined by underground techniques. Both Bowie and Oxbow have existing surface portal facilities which are located on private property controlled by the companies and which would continue to be used for any future extraction of coal from the subject lease tracts. Both companies plan for upgrades to their existing surface facilities. Bowie plans for the installation of a new conveyor system and coal storage area to replace an existing truck haul road. Oxbow would construct a new portal pad and drive new entries to access the Elk Creek tract. This portal pad is on private land and is immediately adjacent to the Oxbow surface facilities. If another company is a successful bidder for either tract, it is likely that new surface facilities may be required. Regardless of what company obtains the subject lease tracts, underground mining methods would be needed to extract the coal. The EIS will consider the mining plans as proposed by Bowie and Oxbow, the no-action alternative, the possibility of other companies obtaining and developing operations to extract coal from the subject lease tracts, and other alternatives. The analysis will also consider mitigation developed during the process. The development of alternatives will occur after the completion of project scoping. The Bureau of Land Management must decide whether or not to approve the coal applications and if so identify special stipulations needed to protect the mineral and non-mineral resources. In accordance with the Coal Leasing Amendments Act of 1976, which amended the Mineral Leasing Act of 1920, the Forest Supervisor for the Grand Mesa, Uncompahgre and Gunnison National Forest, must decide whether or not to consent to leasing by the Bureau of Land Management and if so identify special stipulations needed to protect non-mineral resources on National Forest lands. OSM will be a cooperating agency in the preparation of the EIS. If the tracts are leased to the applicants, the new leases must be incorporated into the existing mining plans of Oxbow and Bowie and the Secretary of the Interior must approve the revised mining plan before the Federal coal in the tract can be mined. OSM is the Federal agency that would be responsible for recommending approval, approval with conditions, or disapproval of the revised mining plan to the Secretary if the tracts are leased. A tentative list of permits or licenses that may be required to mine the coal resources is listed below: Bureau of Land Management Plan of Operations (mining and exploration) Special use permits (Right-of-Ways, etc.) Forest Service Plan of Operations (mining and exploration) Special use permits (Right-of-Ways, etc.) U.S. Army Corps of Engineers Section 404 Permit Environmental Protection Agency Spill Prevention Control and Countermeasure (SPCC) Plan Review of Section 404 permit Notification of Hazardous Waste Activity U.S. Fish and Wildlife Service Threatened and Endangered Species Consultation Treasury Department (Dept. of Alcohol, Tobacco and Firearms) Explosives User Permit Mines Safety and Health Administration Mine Identification Number Legal Identity Report Miner Training Plan Approval Ventilation Plan Approval Ground Control Plan [[Page 18046]] Office of Surface Mining Mining Plan Concurrence Colorado Department of Minerals and Geology Exploration Permit Mining and Reclamation Permit Colorado Department of Public Health & Environment--Air Pollution Control Division Permit to Construct Permit to Operate Colorado Department of Public Health & Environment--Water Quality Control Division Stormwater Discharge Permit National Pollutant Discharge Elimination System (NPDES) Colorado State Engineer Water Rights Water Well Permits Dam Safety Permits Colorado State Historic Preservation Office Historic and Archaeological Review Colorado Department of Transportation Highway Access Delta County Special Use Permit Building Permit Gunnison County Special Use Permit Building Permit There are four underground coal mines (Bowie No. 1 (inactive), Bowie No. 2, Sanborn Creek, and West Elk) located east of Paonia, Colorado, in Delta and Gunnison Counties. Several issues related to these applications were identified during the initial scoping for the EA's in 1998, including the potential impacts to water rights, surface and ground water, agricultural lands, wildlife habitat, noise, train and truck traffic, socio-economics, and access to public lands that may occur if these applications are issued. If you have specific concerns about these issues, or have other concerns or issues that BLM should consider in processing these applications, please address them in writing to the above address. Written comments should be received by May 17, 1999, in order to be fully considered in the draft EIS. Please note that your comments, name, address, and any other personal information you provide will become part of the public record and will be available for public review. You may request confidentiality by clearly stating your request at the beginning of your comment. The agencies will consider withholding your name, address and any other personal identifying information on a case-by-case basis to the extent allowed by law. Submissions from organizations, businesses, and individuals identifying themselves as representatives or officials of organizations or businesses will be made part of the public record. The comment period on the Draft EIS will be sixty (60) days from the date the Environmental Protection Agency publishes the notice of availability in the Federal Register. (Now anticipated to be in mid August.) At this early stage, it is important to give reviewers notice of several court rulings related to public participation in the environmental review process. First, reviewers of draft environmental impact statements must structure their participation in the environmental review of the proposal so that it is meaningful and alerts an agency to the reviewer's position and contentions, Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 553 (1978). Also, environmental objections that could be raised at the Draft EIS stage but that are not raised until after completion of the Final EIS may be waived or dismissed by the courts, City of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (e.d. Wis. 1980). Because of these court rulings, it is very important that those interested in this proposed action participate by the close of the comment period so that substantive comments and objections are made available to the agencies at a time when they can meaningfully consider them and respond to them. To assist the agencies in identifying and considering issues and concerns on the proposed action, comments on the Draft EIS should be as specific as possible. It is also helpful if comments refer to specific pages or chapters of the draft statement. Comments may also address the adequacy of the Draft EIS or the merits of the alternatives formulated and discussed in the statement. Reviewers may wish to refer to the Council on Environmental Quality regulations for implementing the procedural provisions of the National Environmental Policy Act at 40 CFR 1503.3 in addressing these points. Dated: April 7, 1999. Jerald L. Jones, EIS Project Manager, Uncompahgre Field Office. Thomas Condos, Forest Engineer, Grand Mesa, Uncompahgre and Gunnison National Forests. [FR Doc. 99-9151 Filed 4-12-99; 8:45 am] BILLING CODE 4310-JB-P
Document
Notice of Intent
The Bureau of Land Management (BLM) and the Forest Service (FS) will direct preparation of a third-party Environmental Impact Statement (EIS) to document the analysis and disclo...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
64 FR 18044
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Notice of Intent,” thefederalregister.org (April 13, 1999), https://thefederalregister.org/documents/99-9151/notice-of-intent.